Sunshine, Lake Balaton, sails – and the key issues facing the domestic property market at the Property Regatta
Grab your tools – The large-scale workshow for builders and gardeners is about to begin
Apples and pears: according to MKIF, no valid conclusions can be drawn about the operation of the M6 from technical parameters that are not comparable
The Miskolc cave spa was completed in time for 20 August thanks to some ingenious solutions – a photo gallery and on-site report
A historic landscape where every stone has a story to tell – the English Garden in Tata is being restored
The 25,000-square-metre training centre at the Ludovika Campus, complete with a fire station and halls of residence, has been completed
From the town centre to the spa – a cycle path over three kilometres long is being built in Kiskunmajsa
One of Lidl’s largest European logistics centres has been handed over in Kiskunfélegyháza
Nyírbátor is to get a new sports hall
The BKK trolleybus depot is being adapted to meet the needs of the 2030s
A major US investment is boosting energy investment in Romania
Kaposvár’s ‘sponge city’ development could serve as a national model programme
New car parks with permeable surfacing are being built in Zugló – rainwater will be retained on site
It is not an empty building that is energy-efficient, but one that is managed intelligently
STRABAG is relieving the strain on the electricity system through plant shutdowns and reorganised production
The SWIETELSKY Vasúttechnika Kft. has been declared the winner in two railway development projects
Renovation work begins on one of the country’s most important railway bridges
One of the country’s most important railway lines is set to undergo a major upgrade
Seven and a half kilometres of railway track are to be renewed between Kiskunfélegyháza and Gátér
New pedestrian crossings and a junction with traffic lights are being built in Angyalföld
A new co-CEO has joined KÉSZ Csoporth
The Sándor Wekerle Housing Construction Programme – up to two billion euros could boost the Hungarian housing construction market
The Duna Aszfalt redeems the bonds issued under the GED Africa project
A major construction contract is speeding up the construction of the Paks sill
Students were introduced to the high-tech construction industry at BME’s field camp in Göd
From 3 January, trains will once again run on the section of track north of the capital.