Industry news
Here are the Hungarian winners of the world’s most prestigious construction industry award
A global property organisation bringing together professionals from more than 70 countries, which also holds consultative status with the ENSZ, is the Paris-based FIABCI (International Real Estate Federation). One of the sector’s most important events, the FIABCI World Prix d’Excellence global competition, is held annually to recognise outstanding, sustainable architectural projects.
Since 1997, the organisation’s Hungarian branch, FIABCI Magyarország, has been organising the Hungarian Property Development Quality Award competition, which serves as a preliminary round and qualifying event for the international final. Thanks to this, Hungary ranks among the European leaders and has already won dozens of international awards with projects such as Liget Budapest, the Magyar Zene Háza and the MOL Campus.
Among this year’s award winners, alongside the work of the industry’s most prominent players, we also find – somewhat unusually – a Ukrainian-Lithuanian project, which immediately ranked among the most successful entries.
1st prize
DVM Group Kft. for the The St. Regis Budapest entry
The Klotild Palace in the North is one of the most prominent listed buildings in central Pest; it was built in 1899–1900 to a design by Flóris Korb and Kálmán Griegl.
The current refurbishment of the building is part of the development of the Marriott The St. Regis hotel, due to be completed between 2022 and 2026, covering a net floor area of approximately 10,650 m². The interior design concept by the French Moinard Bétaille studio is based on a fusion of international luxury design and local craft traditions: a brass leaf installation in the five-storey atrium, bespoke terrazzo flooring in the lift lobbies, and opera-inspired wood-veneer frames and porcelain minibars in the rooms.
The renovation preserves the heritage features of the façade, the arcade, the main stairwell, the east stairwell and the former Municipal Pharmacy in accordance with restoration plans, whilst adapting the hotel’s facilities – reception, restaurants, spa, conference centre and nearly 100 guest rooms – to the characteristics of the historic building.
2nd Prize and the BKIK Special Prize
art1st design studio Kft. for the Citadella – A Szabadság Bástyája for its competition entry
The Citadella is a memorial to the defeated revolution and struggle for freedom.
After the Habsburg and Russian forces had crushed Hungary’s 1848–49 War of Independence, the Habsburg authorities built a fortress on Gellért Hill. Completed in 1856, the Citadella’s cannons were aimed at Buda and Pest: the fortress thus became a weapon pointed at the city, a symbol of imperial power and oppression. The redevelopment turns this meaning on its head: it renders the weapon ineffective and returns the Citadel to the citizens of Budapest.
Two bold cuts open up the once-closed fortress and reconnect the two sides of Gellért Hill. Within the restored walls, the military fortress is transformed into a public park, whilst the western rotunda will house an exhibition showcasing Hungary’s struggles for freedom. The large, all-glass auditorium opens up the fortress towards the city. More than 90 per cent of the historic building complex has been preserved following renovation.
The weapon raised against the city becomes its opposite: the Bastion of Freedom — an open park, an exhibition space and a meeting place overlooking Budapest.
WON THIRD PRIZE, RECEIVED FIRST PRIZE IN THE EDUCATION CATEGORY, WAS AWARDED THE ATTILA KOVÁCS MEMORIAL PRIZE, AND WAS VOTED BEST PROJECT BY THE ENTRANTS, PLACING THIRD
the entry for the Bucha Erdei Osztályterem
The „Bucha Forest Classroom” (Bucsai Forest Classroom) is a project implemented as part of the Új Európai Bauhaus (NEB) initiative, which promotes sustainable, inclusive and aesthetic design. The project was launched through a joint effort by the Bucsai Iskolát Támogató Alap and Bucsai Városi Önkormányzat in response to the capacity shortfall in local educational institutions caused by war-related damage to infrastructure and the growing number of people forced to leave their homes (internally displaced persons) who have settled in the town. In response to these pressing challenges, the initiative aims to create a sustainable classroom set within a natural environment in Bucsa, providing a unique space for learning, mental wellbeing and environmental education. The project was implemented in close collaboration with Lithuanian volunteers and members of the Bucsa community. The initiative was made possible thanks to the commitment of 160 volunteers and 323 private donors, as well as the support of 43 partner organisations.
Renowned companies and outstanding buildings feature amongst the award winners
THE HOTEL WON FIRST PRIZE IN CATEGORY I:
for the entry submitted by Malomkert Kft. for the Malom és Kacsa Bisztró, Event Centre; Malom és Kacsa Boutique Hotel
THE FIRST PRIZE IN THE ‘OTHER FUNCTIONS’ CATEGORY WAS AWARDED TO:
LAB5 architects for their entry for the K&H Bank branch, Oktogon
THE PUBLIC PARK, WON FIRST PRIZE IN THE LANDSCAPE ARCHITECTURE CATEGORY, THE HUGBC SPECIAL PRIZE, AND THE SPECIAL PRIZE FROM THE HUNGARIAN URBAN PLANNING SOCIETY:
The Budapest Capital City XIIIth District Local Council is organising a competition to transform the car park into a green oasis – the Rokolya Community Park in the 13th District – a competition entry
WON THE CATEGORY I AWARD FOR HERITAGE CONSERVATION:
Paulinyi & Partners Zrt. the the renovation of the Tihany Benedictine Abbey and the extension of the St Christopher Pilgrims’ House competition entry
WON FIRST PRIZE IN THE LOGISTICS AND INDUSTRY CATEGORY:
for the IGPark DN Ingatlanfejlesztő Kft. IGPark Debrecen Logistics Centre design proposal
THE FIRST PRIZE IN THE CULTURAL CATEGORY WAS AWARDED TO:
TÓ HOTEL Kft. and METTRIN Rendezvény- és Művészeti Központ: for the entry entitled “Where the world comes round …”
THE OFFICE BUILDING WON FIRST PRIZE IN ITS CATEGORY:
for the UNI-INVEST Kft. UNI-INVEST OFFICE BLOCK> design proposal
IT WON FIRST PRIZE IN THE RESIDENTIAL BUILDING CATEGORY AND FIRST PRIZE IN THE ENVIRONMENTALLY CONSCIOUS CATEGORY:
FEV IX. Ferencváros Asset Management and Urban Development Ltd. at 27/b Balázs Béla Street. municipal block of flats for the renovation and extension of the property
WON THE SPECIAL AWARD FROM THE REAL ESTATE DEVELOPERS’ ROUND TABLE ASSOCIATION AND WAS NAMED THE BEST-PRESENTED PROJECT:
Forestay Group and Moxy Budapest Downtown for their entry
The FIABCI HUNGARIAN CHAPTER’S SPECIAL PRIZE AND THIRD PRIZE FOR BEST PROJECT, AS VOTED FOR BY THE ENTRANTS, WERE AWARDED TO:
Nyíregyházi Állatpark Nonprofit Kft. for the Ice World entry
HE WAS AWARDED THE SPECIAL PRIZE BY THE BUDAPEST CHAMBER OF ARCHITECTS:
the Budapest Főváros VI. Kerület Terézváros Önkormányzata + the Studio Kraft architectural practice (Viron Mérnökiroda Kft.) for their design entry ‘Vertical Playground’ at the Bajza Street Primary School
AWARDED THE SPECIAL PRIZE BY THE NATIONAL ASSOCIATION OF BUILDING CONTRACTORS:
SWIETELSKY Építő Korlátolt Felelősségű Társaság has submitted a design proposal for the reconstruction of the central section of the M3 metro line in Budapest (Nagyvárad tér — Lehel tér) tender
WON THE LAKÁSVÁSÁR MEDIA GROUP’S SPECIAL PRIZE:
the Budapest Capital City XIII District Local Authority for the competition entry ‘With Dignity, in Community: a new care centre for the elderly’
HE WAS AWARDED THE SPECIAL PRIZE OF THE HUNGARIAN CHAMBER OF ARCHITECTS:
4D Építész Stúdió Kft., KE-VÍZ 21 zRt. and Tokaj-Hegyalja University Campus: comprehensive development, modernisation and refurbishment of the buildings – competition entry
THE SPECIAL PRIZE OF THE HUNGARIAN ARCHITECTS’ ASSOCIATION, THE ÉPÍTÉSZFÓRUM SPECIAL PRIZE AND THE FIRST PRIZE FOR BEST PROJECT, AS VOTED FOR BY THE ENTRANTS, WERE AWARDED TO:
the Deichler Jakab Stúdió for the Balatoni Chief Architect’s Office competition entry
WON THE SPECIAL AWARD FROM THE HUNGARIAN HOTELS AND RESTAURANTS ASSOCIATION:
SWIETELSKY Magyarország Kft. and You Hotel Budapest – Handwritten Collection entry
THE IRODAKERESO.HU SPECIAL AWARD WAS PRESENTED TO:
Property Market Kft. the BudaPart DOWNTOWN office building and Radisson Hotel Budapest BudaPart for the competition entry.
Source: Link
-
Current at 2026. 10. 17.
Young skilled workers can set off on their apprenticeship placements today as well
-
Industry news 2026. 10. 18.
The road construction sector celebrated its half-century anniversary in Eger
-
Railway development 2026. 10. 23.
The Buda interchange could also be extended northwards
-
Industry news 2026. 10. 16.
Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

