Climate-X

Floodwaters, not electricity, bring relief – water retention has begun on the Körös rivers too

Published

Illustration: MTI
The higher water level has enabled gravity-fed water replenishment, meaning that water flows into the backwaters without the need for energy.

As a result of the heavy rainfall over the past few weeks, the national average rainfall up to 23 November stood at 83 millimetres: this rainfall, which is well above the monthly average, is of enormous significance following the severe drought.

Accordingly, water retention works are taking place across the country, and preparations are under way for developments to this end – as reported in yesterday’s article in the Klíma-X column demonstrated yesterday with news of the Fertő-Hanság project.

Another important process may have begun in the southern corner of Jász-Nagykun-Szolnok, in the area around Szelevény and Kunszentmárton. Here, work has begun on diverting floodwaters from the Hármas-Körös into the Máma–Tőkefoki Canal. From there, the waters are being channelled via the Csiga-éri Canal to fill both the Tehenesi Holt-Körös and the Rácz Holt-Körös.

Photo: László Gajdos Facebook page

The Minister for the Environment, who announced the news, added on his Facebook page that they had set to work immediately as soon as the long-awaited rain arrived. According to László Gajdos report states that the rise in water levels has enabled gravity-fed water replenishment, meaning that by opening the sluices, the water flows naturally from the main channel into the backwaters without the use of energy. „I believe that both farmers and wildlife deserve for us to fight for every single drop,” he said.

Source: Link

Popular