What is being built?
Four-storey halls of residence and school extension – The refurbished technical college in Nagykálló has been handed over
A major educational development project has been completed in Nagykálló, which our newspaper has also been following. As part of the project, the Budai Nagy Antal Technikum was provided with a new main building, and a four-storey hall of residence wing was built under the general contracting of „KE-VÍZ 21” zRt. as the main contractor. This resulted in a development of nearly 4,000 square metres – in line with the institution’s growing student numbers.
The official handover of this major investment took place on 20 November during a ceremonial event, which was also reported by szon.hu also reported.
Community spaces for students
One of the most significant elements of the school construction project in Nagykálló is the new four-storey boarding block, which has been fitted out to accommodate a total of 148 pupils in four-bed rooms.
The institution’s main building has also been significantly extended: six new classrooms, each measuring between 52 and 88 square metres, have been built, along with four storage rooms, toilets, a communal area and an assembly hall. The new sections of the building are linked to the existing building by a network of corridors. To provide space for community life, a two-storey, paved public space has been created between the buildings, whilst the roof terrace adjoining the assembly hall can even serve as a venue for student events. A heat pump provides the energy for the building’s heating and cooling system.
The investment in Nagykálló is intended to improve the infrastructure for vocational training and create new opportunities for students.
Source: Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 17.
Young skilled workers can set off on their apprenticeship placements today as well
-
Current at 2026. 10. 13.
It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about
-
Industry news 2026. 10. 18.
The road construction sector celebrated its half-century anniversary in Eger
