Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • The expansion joints on the Buda side of the Erzsébet Bridge were installed overnight

    • Industrial investment is set to boost fruit production in the Nyírség region

    • Renovation work is set to begin on dozens of public buildings in Terézváros

    • The new industrial production hall could boost economic development in Matyóföld

    • The Mercedes nursery in Kecskemét has doubled its capacity

  • Climate-X
    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

    • The construction of huge water reservoirs would help to strengthen Debrecen’s drinking water supply

  • Bound track
    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

    • Test trains are rattling along the new Slovenian railway viaduct

    • Nearly 880 tonnes of crushed stone are being moved on the 1-es vasútvonalon – track conditions are improving over a 600-metre stretch

    • Railway development is coming to the Hungarian Puszta too: Hortobágy station is being refurbished with an accessible platform and track works

  • Industry news
    • The road construction sector celebrated its half-century anniversary in Eger

    • Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

    • A space brimming with information and encounters – that’s what the Infotér CONTECH was like

    • Off to Lake Balaton – Contech for the third time!

    • The refurbishment of Citadella has won an international award – 14,000 square metres of historic stonework have been restored

  • Magyar Építők
Property2026. 10. 12.

A retail centre may be built in the Pécs conurbation: Kozármisleny is seeking an investor

The local authority’s aim is not simply to sell the property, but to establish a service centre that will contribute to Kozármisleny’s development in the long term...

Property

Property2026. 09. 22.

The Market Csoport brings together all its development expertise under one roof

Property2026. 08. 03.

Flats designed for young people are being built near the Puskás Stadium

  • Property2026. 08. 03.

    Józsefváros is reducing its stock of vacant flats

    Around 25 council flats in Józsefváros are set to be refurbished; the tender for the framework agreement was won by Épkar.

  • Property2026. 07. 07.

    Let’s not miss out on the buyer! Ákos Balla on down-to-earth property development

    For many years, the Bayer Construct group of companies has worked tirelessly to cover the entire construction industry value chain, offering affordable homes through innovative solutions and rapid construction....

  • Property2026. 07. 01.

    Two new accommodation facilities are being developed in Budapest’s Józsefváros district

    In a nutshell, what do you need to know about these investments? The JZSF 48 Kft. and JZSF 39 Kft.

  • Property2026. 06. 23.

    When will it become a trend? Rental flats are being built from a derelict school in Újpest

    There is hardly a reader among us who has not noticed this in their own lives: in recent years in Hungary, the euro…

  • Property2026. 06. 21.

    This development will complete the Wing industrial park in Vecsés

    The new warehouse building will have 3,300 m² of lettable space, a ceiling height of 12 metres and 8 loading bays.

  • Property2026. 04. 27.

    The shopping centre project being built along the M3 motorway has made significant progress

    With this investment, Faedra Group is entering the retail property market; the project’s prime location and well-thought-out concept proved to be a strong selling point in securing financing.

  • Property2026. 04. 27.

    Erzsébetváros is preparing for a project of historic proportions: a council-owned block of flats is to be built

    The new rental flats could significantly improve housing options in Budapest’s 7th district.

More Posts
Next '
  • Latest
  • Popular
Water management2026. 10. 20.

Reconstruction of the M1 motorway’s carriageway towards Győr can begin under the new traffic arrangements

Bound track2026. 10. 20.

Alpine engineering techniques are also being used to protect the railway in the Danube Bend

Road building2026. 10. 20.

Instead of patchwork repairs – large-scale refurbishment work is under way on the dilapidated main roads in the Transdanubia region

What is being built?2026. 10. 20.

The expansion joints on the Buda side of the Erzsébet Bridge were installed overnight

Bound track2026. 10. 19.

This time, speed limits are being lifted on the Hatvan–Szolnok line

Climate-X2026. 09. 22.

From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

What is being built?2026. 09. 23.

Another block of flats could be extended by two storeys in the Ferencváros regeneration area

What is being built?2026. 09. 22.

They would not only modernise the debreceni Nagyállomást, but also develop it into a modern transport hub

Bound track2026. 09. 24.

Major renovation work is set to begin on the Buda section of tram line 6

Climate-X2026. 09. 26.

The first municipal thermal power station in Transylvania is under construction

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 20 October 2026.