For the comprehensive restoration of natural stone walls – from masonry work and restoration right through to impregnation – the Mapei system solutions were chosen across the board.
Psychologist, tactical football manager, and at times almost a hostage negotiator – a leader needs an extremely wide range of skills and must fulfil a variety of roles in order to successfully carry out complex projects with their team, such as...
One of Budapest’s most famous vantage points, the Citadel atop Gellért Hill, has been given a new lease of life. Following its restoration as a listed building, this iconic Budapest fortress has been opened up, allowing access from three directions. The...
From now on, a plaque will inform everyone that the building’s award-winning appearance is the result of the work carried out by ZÁÉV.
The Szolnok base of the Hungarian Defence Forces’ 86th József Kiss Helicopter Brigade has been expanded with a new, multi-purpose hangar complex. The construction work was carried out by specialists from ZÁÉV Építőipari Zrt..
The 2,500-square-metre combat vehicle repair workshop, handed over today at the Tata barracks of the 1st György Klapka Armoured Brigade, features specialised repair bays, storage areas and ten vehicle bays.
One year after the foundation stone was laid, a wreath was placed on the special operations barracks building on Thököly út in Szolnok. The structural construction of the military complex was completed by ZÁÉV Építőipari Zrt., which was commissioned with the general construction.
The ground floor will house combat sports areas, while the upstairs hall will serve as a gymnasium.
The cultural centre, for which ZÁÉV Építőipari Zrt. received the Construction Industry Quality Award, one of the most prestigious awards in the sector, was built on the site of a former military facility....
The editor-in-chief of our newspaper also received the award.