Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Sunshine, Lake Balaton, sails – and the key issues facing the domestic property market at the Property Regatta

    • Grab your tools – The large-scale workshow for builders and gardeners is about to begin

    • Apples and pears: according to MKIF, no valid conclusions can be drawn about the operation of the M6 from technical parameters that are not comparable

    • The Miskolc cave spa was completed in time for 20 August thanks to some ingenious solutions – a photo gallery and on-site report

    • A historic landscape where every stone has a story to tell – the English Garden in Tata is being restored

  • Paks II
  • MKIF
  • What is being built?
    • The 25,000-square-metre training centre at the Ludovika Campus, complete with a fire station and halls of residence, has been completed

    • From the town centre to the spa – a cycle path over three kilometres long is being built in Kiskunmajsa

    • One of Lidl’s largest European logistics centres has been handed over in Kiskunfélegyháza

    • Nyírbátor is to get a new sports hall

    • The BKK trolleybus depot is being adapted to meet the needs of the 2030s

  • Climate-X
    • A major US investment is boosting energy investment in Romania

    • Kaposvár’s ‘sponge city’ development could serve as a national model programme

    • New car parks with permeable surfacing are being built in Zugló – rainwater will be retained on site

    • It is not an empty building that is energy-efficient, but one that is managed intelligently

    • STRABAG is relieving the strain on the electricity system through plant shutdowns and reorganised production

  • Bound track
    • The SWIETELSKY Vasúttechnika Kft. has been declared the winner in two railway development projects

    • Renovation work begins on one of the country’s most important railway bridges

    • One of the country’s most important railway lines is set to undergo a major upgrade

    • Seven and a half kilometres of railway track are to be renewed between Kiskunfélegyháza and Gátér

    • New pedestrian crossings and a junction with traffic lights are being built in Angyalföld

  • Industry news
    • A new co-CEO has joined KÉSZ Csoporth

    • The Sándor Wekerle Housing Construction Programme – up to two billion euros could boost the Hungarian housing construction market

    • The Duna Aszfalt redeems the bonds issued under the GED Africa project

    • A major construction contract is speeding up the construction of the Paks sill

    • Students were introduced to the high-tech construction industry at BME’s field camp in Göd

  • Magyar Építők

Raiffeisen Bank Hungary

  • What is being built?8 months ago

    This residential project in Pest redefines luxury urban living.

    The development is expected to be completed by the end of 2027, adjacent to the Dohány Street Synagogue.

More Posts
  • Latest
  • Popular
Road building2026. 09. 03.

Last-minute preparations before handover – This is how the refurbishment of the Flórián Square flyover came to an end

What is being built?2026. 09. 03.

The 25,000-square-metre training centre at the Ludovika Campus, complete with a fire station and halls of residence, has been completed

Road building2026. 09. 03.

A 184-kilometre road, a 362-metre bridge – A close-up look at road construction in Africa

Industry news2026. 09. 03.

A new co-CEO has joined KÉSZ Csoporth

What is being built?2026. 08. 06.

Paks II.: What does the new milestone for Unit 5 mean in the context of the review?

Industry news2026. 08. 06.

Four giant cables are linking the electricity grids of Spain and France beneath the seabed

What is being built?2026. 08. 06.

The development of the road and utility networks for the logistics base near Liszt Ferenc Airport has been completed

Bound track2026. 08. 17.

New pedestrian crossings and a junction with traffic lights are being built in Angyalföld

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 4 September 2026.