What is being built?
Greener public spaces, safer transport – Szív Street in Terézváros has been renovated
Wider pavements, completely renovated surfaces and lots of plants welcome pedestrians in Budapest's 6th district on the modernised section of Szív Street, according to the Terézváros community page. The project, located near Andrássy út, a popular tourist destination, was carried out by the experts at HE-DO Kft..
The pavements have been resurfaced.
The development affected the section of Szív Street between Aradi Street and Andrássy Avenue, as well as the Szív Street–Aradi Street intersection. On the 1,100 square metre area affected by the intervention, the asphalt pavement of the pavements was replaced with paving stones on both sides.
They made traffic safer at the junction.
The road surface was renewed, and in one section, the contractors' specialists laid new paving stones and installed a traffic-calming threshold. A fire hydrant was relocated and space was created for planters.
The road section became greener in just a few weeks.
Work commenced on 2 December 2025. First, the junction was constructed, followed by the replacement of the pavement on both sides of the road. The investment was financed from municipal funds.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage