Industry news
The Innovinia portfolio in Nyíregyháza has been expanded with a new hall
The IGPark light industrial production unit in Nyíregyháza (BTS) has been completed. Its tenant, the automotive company CAIP, has already taken possession of the premises.
This premium-category investment was realised through a collaboration between Innovinia and the tenant, covering the entire process from design and planning permission through to turnkey construction – announced Portfolio. The facility, which comprises a fully customised, built-to-suit (BTS) light industrial manufacturing unit with a floor area of nearly 31,000 m², was constructed by Weinberg ’93 Építő Kft. carried out the project.
The production unit has been adapted to the specific technological and manufacturing requirements of CAIP.
The building in question is situated in one of Nyíregyháza’s developing industrial zones, in an area where major global corporations such as Sunwoda, , Boysen and Qvantum operate. Debrecen Airport is just 48 km away, which enhances the location’s international appeal.
Innovinia is one of the leading Hungarian-owned property developers on the domestic property market and a leading regional industrial and logistics developer; this project, too, was characterised by the implementation of sustainability and environmental awareness requirements, During the construction of the production hall, particular attention was paid to energy-efficient solutions and adherence to ESG criteria.
On the 15-hectare site in Nyíregyháza, the remaining 7.5-hectare prepared development area under the Innovinia project is ready for the construction of a further 42,000 m² of light industrial or logistics capacity, offering flexibility to adapt to future market and tenant requirements.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage