What is being built?
Bugyi’s new industrial estate has been handed over with a full range of infrastructure
The development of the industrial estate in Bugyi has been completed. The local council has secured a non-repayable grant for the project, which – as we reported in our previous article – was carried out by HE-DO.
Ten industrial plots have been developed
The industrial estate is situated on the outskirts of Bugyi, alongside Road No. 5202 leading towards Dabas. On this 3.36-hectare site, which is owned by the local council, ten industrial plots have been created, each ranging in size from 2,538 to 4,014 square metres. As part of the development, the internal access road network within the industrial estate has been constructed, along with the drinking water, sewage, electricity and fibre-optic networks. A fence running along the plot boundaries has been completed, and an office container has also been installed. Work commencing in the autumn of 2025 included the installation of street lighting within the industrial estate, as well as along a 250-metre section of Road 5202.
New businesses are welcome in the industrial estate
The aim of the investment, carried out under the Regional and Urban Development Operational Programme Plus, is to provide a well-organised environment for industrial activities, separate from residential areas. The local authority expects this new area, equipped with basic infrastructure, to boost the town’s economic competitiveness and create new jobs. The industrial plots provide the conditions for new businesses, including knowledge-intensive enterprises, to establish themselves, whilst also offering development opportunities for businesses already operating in Bugyi that wish to expand.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage