Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

    • Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage

    • Sunshine, Lake Balaton, sails – and the key issues facing the domestic property market at the Property Regatta

  • Paks II
  • MKIF
  • What is being built?
    • Rerouted lines – a major upgrade is set to begin on the trolleybus network linking the city centre with Népliget

    • Development work worth over two billion forints is being prepared at two educational institutions in Kaposvár

    • Everyone needs a bit of exercise! The Fitt park pump track in Barcs was built using hand-formed curves

    • Romania’s largest Lidl shopping centre is being built in Bucharest

    • The Faculty of Health Sciences at the University of Szeged is set for expansion

  • Climate-X
    • Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof

    • A major US investment is boosting energy investment in Romania

    • Kaposvár’s ‘sponge city’ development could serve as a national model programme

    • New car parks with permeable surfacing are being built in Zugló – rainwater will be retained on site

    • It is not an empty building that is energy-efficient, but one that is managed intelligently

  • Bound track
    • Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines

    • Many people have been waiting for this: Zugló railway station is set to undergo a comprehensive refurbishment as part of accessibility improvements

    • Experts are working on a 28-kilometre section of the Miskolc–Hidasnémeti vasútvonalon

    • The SWIETELSKY Vasúttechnika Kft. has been declared the winner in two railway development projects

    • Renovation work begins on one of the country’s most important railway bridges

  • Industry news
    • The AKKO Invest may be expanded to include a designer of airport hotels

    • The KBM call for entries is aimed at the cream of the crop of Hungarian architecture

    • A new co-CEO has joined KÉSZ Csoporth

    • The Sándor Wekerle Housing Construction Programme – up to two billion euros could boost the Hungarian housing construction market

    • The Duna Aszfalt redeems the bonds issued under the GED Africa project

  • Magyar Építők

FBIS

  • Industry news9 months ago

    Seeking answers to pressing questions – How can affordable housing be built?

    Top executives from the domestic construction industry and social experts sit down together at the KÉK season opener.

More Posts
  • Latest
  • Popular
What is being built?2026. 09. 13.

Rerouted lines – a major upgrade is set to begin on the trolleybus network linking the city centre with Népliget

Industry news2026. 09. 12.

The AKKO Invest may be expanded to include a designer of airport hotels

Bound track2026. 09. 12.

Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines

Industry news2026. 09. 11.

The KBM call for entries is aimed at the cream of the crop of Hungarian architecture

Bound track2026. 08. 17.

New pedestrian crossings and a junction with traffic lights are being built in Angyalföld

Industry news2026. 08. 18.

Students were introduced to the high-tech construction industry at BME’s field camp in Göd

Current at2026. 08. 17.

A historic landscape where every stone has a story to tell – the English Garden in Tata is being restored

What is being built?2026. 08. 18.

New paving, a playground and visitor facilities are being planned for the Várkör area in Pannonhalma

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 13 September 2026.