Road building
Traffic can now use the renovated connecting road in Szigetköz
The technical handover of the renovated section of the road connecting Vámosszabadi in Győr-Moson-Sopron County with the neighbouring village of Nagybajcs took place as part of the Hungarian Village Programme. On this occasion, István Nagy, Minister of Agriculture and Member of Parliament for the region, gave a speech at a ceremony.
He reported that three minor road sections had been renovated this year in Szigetköz, as part of the Magyar Közút project:
- the Mecsér access road marked 1402, between sections 5+500 and 7+200 km at an altitude of 1724 metres;
- the road connecting Halászi – Dunasziget – Dunakiliti, marked 1407, between sections 9+684 and 10+332, at 648 metres;
- as well as the newly inaugurated road connecting Vámosszabadi and Nagybajcs, marked 1302, between sections 0+000 and 1+724 km, thus covering a distance of 1724 metres.
A total of 331 million forints was spent on these investments, and more than 4.1 kilometres of road were renovated.
The minister also explained that the Hungarian Village Programme for 2025 placed emphasis on improving transport safety and quality, with 786 local authorities nationwide receiving funding totalling HUF 10 billion for the renovation of roads and pavements and the construction of pedestrian crossings.
The same amount was allocated for the renovation of secondary roads connecting small settlements, and HUF 10 billion in government support was also provided for property development and equipment purchases in 936 small settlements.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage