Industry news
From private capital for community use: the renewal of Oroszlán Street and its surroundings in Szeged
On 28 September, the reconstruction of the downtown historic building complex and street in Szeged, which was completed as a private investment of the founder of KÉSZ Csoport, was inaugurated in a ceremony accompanied by festival programmes, according to the information sheet sent to our newspaper.
Environment, hundreds of thousands of paving stones, rainwater reservoir, trees
The renovation of Lion Street, Nádor Street and Deák Ferenc Street involved the laying of nearly 100,000 paving stones in the affected sections and the installation of hundreds of metres of new street lighting cables, water pipes and stormwater drainage grates. Environmental protection was an important aspect of the renovation, with new candelabras and energy-saving LED lights installed, and a 35 m3 rainwater tank was installed to ensure that plants and trees in the public space can be cared for in a sustainable way.
Szeged among the leaders
At the inauguration ceremony László Botka, Mayor of Szeged emphasized: "Szeged not only shapes its present, but also preserves its past, so that it can pass it on to future generations in all its beauty." The mayor mentioned that Szeged is among the top Hungarian cities in terms of the number of local protected buildings, with 682 local protected buildings and 176 listed buildings. In recent years, the city has renovated and greened one of the oldest streets of Szeged, Oskola Street, and improved the cycling infrastructure, using its own budget and EU funding totalling HUF 2.4 billion, which has also helped the municipality to create a more coherent image of the Palanka.
The name KÉSZ Csoport is associated with Szeged
Mihály Varga, founder of KÉSZ Csoport, the company responsible for the construction and financing, said in his welcoming speech: „KÉSZ Csoport has always been proud of its Szeged roots, and we are delighted to be able to contribute to the modernisation of the city with dozens of construction and development projects. The renovation of the city centre was a special task, one of which we will always be proud. During the excavation, archaeologists from the Móra Ferenc Museum identified 132 excavation units, allowing us to collect a huge amount of artefacts. We managed to uncover unique archaeological phenomena, such as a section of the defensive structure that gave the Palánk district its name, and the remains of an 18th-19th century workshop,” said the founder of the group, detailing the construction work.
The importance of KÉSZ Csoport in the cityOne of Hungary's leading construction companies has contributed to the development of Szeged with numerous significant projects in its more than 40-year history. These include the purchase, renovation and conversion of the Klauzál Square building, the former Europe Hotel, a building under local protection, and the reconstruction of the Industrik office building. KÉSZ Csoport will also carry out the development of Tilia Office Building, Szeged's first BREEAM and Well-rated, category A office building, with the complete renovation of the locally protected part of the building. The Group is committed to training, as evidenced by the establishment and maintenance of a Sectoral Training Centre Edupark in Tápé, currently with 500 full-time vocational training participants and 200 adult vocational training participants.
Source: Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
