What is being built?
Renovation of the facade of the main building of the University of Debrecen in the centre of Böszörményi út
The construction company that won the public procurement tender, the Hajdúböszörmény-based Tömb 2002 Kft., based in Hajdúböszörmény, will work on the „A” and „B” buildings of the Böszörményi Street campus in Debrecen, carrying out façade renovations , according to EU data.
The two adjoining, connected buildings - which together serve as the main campus buildings - are home to the Faculty of Agriculture, Food Science and Environmental Management of the city university, which has around 1500 students and 250 lecturers and researchers.
The project is funded by the EU's Recovery and Resilience Instrument (RRF) for a total net value of around HUF 773 million, with the important aim of promoting energy-efficient operations. The works on the two buildings, which together have a total installed floor area of 5412 square metres, will both involve
- thermal insulation of the façade walls and the attic,
- the renovation (replacement if necessary) of existing windows and doors (doors, windows, partition walls).
- In addition, the renovation and replacement of pavements, manholes, paving, level crossings, stairs and railings directly connected to the buildings will also be carried out.
The improvements include more than 6,200 square metres of plastering work and the replacement of more than 2,300 square metres of windows and doors, among many other tasks.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Current at 2026. 09. 30.
It’s being built at full speed and could be the saviour of our domestic energy security – what is it?
