The new 620-metre-long cycle path, which will be separated from motor vehicle traffic, is being built by SWIETELSKY Magyarország.
The development will link the existing cycle paths with the tarmac road running along the embankment, thereby making the route between EuroVelo 6 Budapest and the Danube Bend more direct.
Once again, Naszály – situated in picturesque surroundings – is extending its cycle path, this time by 720 metres. The village, which has also served as a film location, is moving ever closer to becoming directly connected to...
The decades-long efforts of the municipalities of Máriakálnok and Halászi are coming to fruition with the large-scale development of cycling infrastructure between the two settlements. One of the most important tourism and transport investments in Szigetköz is the STRABAG...
The redesign of the EuroVelo 6 cycling route between Lábatlan and Esztergom can start.
A new cycle path section in Újpest could create a direct link between Budapest city centre and the Danube bend
A 13.5-kilometre stretch is planned between Ács and Bábolna.
The two and a half kilometre cycle route will take you between Villány and Máriagyűd.
The suburban road connecting Naszályt to Dunaalmás was paved with a solid surface by STRABAG.
About two kilometres of path will be built.