Letkés completes blue infrastructure development with EU support.
Most of the votes were for the St. Borbala bridge connecting the end of the Ipolyhíd with Drégelypalánk.
Between Drégelypalánk and Ipolyhídvég, the 20 kilometres of road has been reduced to less than a tenth of its previous length.
A border crossing bridge was built by Colas.
Based on the documentation of Főmterv, the bridge was built by Hídépítő.