Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Course Mapei has launched an educational „mini-show” on thermal insulation

    • Pothole repair at five times the speed – that’s what JCB’s specialised machine is all about

    • „We see what’s happening in the world and we want to play an active part in it”

    • Project KÉSZ Csoport has refurbished six treatment rooms at Bethesda Children’s Hospital

    • The M5 motorway is in tatters – can the M6 save the day?

  • Paks II
  • MKIF
  • What is being built?
    • The new centre, built alongside the M1 motorway, is owned by a leading company in the domestic pharmaceutical industry

    • One of the largest beaches in the Southern Great Plain could soon feature a waterside promenade

    • We show in photos the progress of the shopping centre currently under construction in Salgótarján

    • Renovation of a world-record-holding building begins in Kelenföld

    • Almost football – The former sports swimming pool in Veszprém is being converted into a futsal training hall

  • Climate-X
    • Every day, Hungary’s natural land area shrinks by the size of a large factory

    • The area around Malom Lake, one of Oroszlány’s proudest landmarks, is being revitalised

    • The redevelopment of the mining site will protect Sümeg from flash floods

    • Who is taking the lead in the construction industry’s green transition?

    • Rain gardens are coming to Budafok, with over 3,000 square metres of green space set to be developed

  • Bound track
    • Mainline maintenance in Pécs could be completed before the festival season begins

    • The future of Rákosrendező is on track – Preparations for the Nyugati railway station development can begin

    • A new railway loading facility is being built in Tata as part of a comprehensive development project

    • Steady growth, expanding presence: DB Cargo Hungária is building a long-term future in the region

    • A new chapter in the Hungarian bridge-building industry – we explored the most exciting sections of the Southern Circular Railway

  • Industry news
    • A logo isn’t enough; you need a competitive product – this is what the first six months of the trademark programme have shown

    • In 2025, Új Ház Zrt. managed to increase both its turnover and profitability

    • Infrastructure developments drove the construction sector in April

    • Drawing on expertise from the automotive industry, Ineton has further developed its world-class prefabrication

    • Ahead of the Champions League final, he began to talk about the jewel in the crown of our built heritage

  • Magyar Építők

MyRA Park M3

  • Property2 months ago

    The shopping centre project being built along the M3 motorway has made significant progress

    With this investment, Faedra Group is entering the retail property market; the project’s prime location and well-thought-out concept proved to be a strong selling point in securing financing.

More Posts
  • Latest
  • Popular
What is being built?2026. 06. 22.

The new centre, built alongside the M1 motorway, is owned by a leading company in the domestic pharmaceutical industry

What is being built?2026. 06. 22.

One of the largest beaches in the Southern Great Plain could soon feature a waterside promenade

Railway development2026. 06. 21.

Renovation of railway bridges in the Tokaj area is set to begin

Industry news2026. 06. 21.

A logo isn’t enough; you need a competitive product – this is what the first six months of the trademark programme have shown

Current at2026. 05. 26.

Concrete could be the future of detached houses

Road building2026. 05. 26.

This is how Venice’s old bicycle bridge was dismantled

Climate-X2026. 05. 26.

Rain gardens are coming to Budafok, with over 3,000 square metres of green space set to be developed

Climate-X2026. 05. 26.

Green Minimum and the life-cycle approach: the construction industry may be on the cusp of a regulatory shift

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.