Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Up to 1,500 cubic metres of concrete are being poured in each phase of the Paks expansion

    • Is this what happens when Szolnok embarks on a new project?

    • The KÉSZ Group and Balatonfondo courses demonstrated exemplary team spirit and achieved record attendance

    • The SZABADICS Ride will set off for the tenth time in June, following the MAPEI Tour de Zalakaroson

    • Even the most determined members of the construction industry completed the 20th Ultrabalaton

  • Paks II
  • MKIF
  • What is being built?
    • Stones of the past, solutions for the future – Saving the stone walls of the Citadel

    • The replacement of the expansion joints on the Erzsébet Bridge is continuing with the third phase

    • A new well will help meet the increased water demand at the Bogácsi Spa

    • Following pipe bursts and technical faults, the healthcare facility in Soroksár is set to undergo mechanical refurbishment

    • A new hotel is being built in the heart of the capital in tribute to the world-renowned Hungarian architect

  • Climate-X
    • Debris-trapping systems are to be installed to protect the railway line in the Danube Bend

    • A town of wind turbines in the Atacama Desert – STRABAG has completed the foundations for 248 towers

    • Practical guides to support the construction industry’s transition to carbon neutrality

    • The renovation of the Balaton water control gate has been recognised with a professional award

    • This is how the construction industry can go green – here’s a leading example from Hungary

  • Bound track
    • A new railway loading facility is being built in Tata as part of a comprehensive development project

    • Steady growth, expanding presence: DB Cargo Hungária is building a long-term future in the region

    • A new chapter in the Hungarian bridge-building industry – we explored the most exciting sections of the Southern Circular Railway

    • Work on the embankment is already underway, and trains will soon be running again on the revitalised Transdanubian railway line

    • The modernisation of the Debrecen–Mátészalka railway line has entered the planning phase

  • Industry news
    • The STRABAG in Szombathely prevented the release of asbestos-containing dust using a special sealing layer

    • Housing construction and EU funding could give the sector a boost

    • A new chapter in the Hungarian construction industry: the Minister for Transport and Investment has been appointed

    • The domestic construction industry has lost yet another contract worth 100 billion

    • From the replacement of the deck to the tram tracks – Preparations are underway for a comprehensive refurbishment of the Petőfi Bridge

  • Magyar Építők

SB Dynamic Kft.

  • What is being built?4 months ago

    The renovation of Lake Kána in the 11th district may continue

    Complex water management and environmental protection measures are being implemented in the four-part lake system of the Kána Lakes.

More Posts
  • Latest
  • Popular
Industry news2026. 05. 21.

The STRABAG in Szombathely prevented the release of asbestos-containing dust using a special sealing layer

What is being built?2026. 05. 21.

Stones of the past, solutions for the future – Saving the stone walls of the Citadel

What is being built?2026. 05. 21.

The replacement of the expansion joints on the Erzsébet Bridge is continuing with the third phase

Current at2026. 05. 21.

Up to 1,500 cubic metres of concrete are being poured in each phase of the Paks expansion

Road building2026. 04. 27.

The HE-DO project will renovate 11,000 square metres of road and build a new Park & Ride car park in Gyöngyös

What is being built?2026. 04. 27.

Research and teaching capacity has quadrupled thanks to the development of Semmelweis University

Industry news2026. 04. 27.

An agency born out of the media – A fresh approach to communications in the construction industry

Industry news2026. 04. 27.

A lost generation or untapped potential? This is how Generation Z is entering the construction industry

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.