Road building
Ten road sections modernised in two settlements in the southern part of Békés County
An important infrastructure development project has been completed in South Békés: a total of ten inner-city road sections have been upgraded in two municipalities.
In Csanádapáca, with a population of 2,300, road repairs were carried out on six streets at a cost of 247 million forints. Three streets had asphalt surfaces, but these were in a very poor condition; two are classified as collector roads. One street was a dirt road.
– announced the municipality.
In Végegyháza, with a population of just over a thousand, four road sections were renovated at a cost of 80 million forints. Both projects were carried out with funding from the EU's Territorial and Settlement Development Operational Programme (TOP) Plus, according to information provided by the local authorities.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage