Property
The site of the flower market is being developed with a playground, footpaths and homes with balconies
The Virágpiac Lakópark is being built in Budapest’s 13th district, on the site of the former flower market, where 451 flats are being offered in a single block – sales of which have now begun. Prospective buyers are offered a variety of floor plans in different sizes and layouts, ranging from studio flats to two- and three-bedroom family homes, providing suitable living spaces for a wide range of lifestyles.
Generous headroom, state-of-the-art building services
Every flat has a balcony or terrace attached to it in the Bayer Property development, where the ceiling height in the living areas is 2.70 metres, individually controllable underfloor heating is being installed in the rooms, and each flat will be fitted with air conditioning. The building’s heating and hot water supply will be provided by a heat pump system.
The flats at Virágpiac Lakópark meet the criteria of the Otthon Start scheme and are also compatible with the Babaváró loan and the CSOK+ scheme.
A promenade and a playground are also being built
The developer is creating a new, green promenade along Szegedi út, featuring a tree-lined avenue, benches and a dog-walking area, which will also provide a pedestrian link between Palóc utca and Szent László út. The nearby shopping facilities, educational institutions and services, combined with the well-developed infrastructure, will provide a very comfortable living environment for those moving here.
A key feature will be the creation of an inner courtyard, sheltered by the building complex and rich in green spaces. At the heart of this landscaped courtyard, there will be a communal area and a playground, whilst the circular walkways and rest areas will provide a peaceful, green setting for everyday life.
Source: Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage