Industry news
Pioneering development for sustainable construction: recyclable formwork system created by PERI
The significant ecological footprint of the construction industry and societal expectations related to the global environmental crisis are pushing more and more construction companies to adopt environmentally responsible building materials.
The PERI – known in Hungary for its formwork and scaffolding solutions – responds to this challenge with developments carried out in Germany:
The DUO universal formwork system was born, which has already proven in several projects that it offers a reusable alternative to traditional solutions.
Robust yet light: the practical benefits of DUO
The DUO's special feature is that it is both durable and easy to handle thanks to its polymer material. It requires no crane and the formwork of an average family house can be transported in a single van, significantly reducing logistics costs and carbon emissions from transport. The use of the system also reduces labour requirements, offering structural engineers not only environmental but also economic benefits.
Conscious life cycle management from the manufacturer
The PERI is not only environmentally conscious during the production of the DUO, but throughout its lifecycle. Once the formwork has been used, contractors can send the products back to the manufacturer for cleaning in automatic washing stations - a solution that significantly reduces water and energy consumption as well as costs. The elements that can still be used are subjected to rigorous checks, and those that can be repaired are refurbished with new shuttering and missing elements. DUO offers a particularly long service life: the shutter shell can be reused at least 100 times and the frame 500 times.
Granulation: closing the loop
But the real novelty starts where other systems wear out. Even DUO batteries that can no longer be repaired don't end up as waste: the PERI takes them to a separate plastics recycling plant, where they are first shredded and then melted down. The resulting granulate is used to make new formwork elements - an example of how the construction industry can be truly sustainable.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
