Industry news
Why is steel superior to other building materials?
What role can steel play in sustainable construction? How can a structure become a resource again instead of waste? What can we learn from Scandinavian examples of steel recycling?
In the latest episode of Weinberg Podcast episode, Adrián Horváth talks to Főmterv Zrt. and Széchenyi Prize-winning bridge engineer, and Róbert Lovas, Weinberg director and managing director of the steel structure manufacturing division, share their professional insights on the present and future of steel from a technical, environmental and social perspective.
The conversation reveals, among other things:
- What are the benefits of modularity in steel structures?
- Why is steel treated as a strategic asset in Scandinavia?
- How can the materials cycle be implemented in the construction industry?
The broadcast is available to watch/listen on the Weinberg Podcast channels:
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
