Kirakat
Terrán KészTető: Fast, accurate, economical construction with robot technology
The new generation of roof tile manufacturing takes roof design to a whole new level, approaching it from a more complex perspective. Only with roof structures and coverings of the highest standard, as well as high-quality materials and products, can we build roofs that are durable and aesthetically pleasing for a lifetime and beyond. The forward-thinking approach of Terrán has made it possible to concentrate the entire process in one place, with Terrán KészTető makes the roof of today the future of your home.
In the case of prefabricated roof structures, thanks to CNC robot technology, timber processing and manufacturing can be scheduled, meaning that the components are ready much sooner.
Thanks to computer-aided design, the amount of timber can be determined to the nearest millimetre, which can save up to 15% of material compared to conventional methods.
Transporting the KészTető is less space-consuming, and moving and unloading it is much easier and space-saving. Pre-engineered carpentry joints greatly reduce the time needed to assemble the elements on site, eliminating the need for rework and cutting, and keeping the site cleaner and tidier.
Thanks to careful preparation using state-of-the-art equipment and trouble-free installation, the KészTető offers an affordable and economical solution for roof construction.
The innovative roof is heat-retaining, has a high load-bearing capacity and also makes the roof space suitable for installation, and is available with a BSH glued beam structure of pine or longitudinal laminated laminates, which is structurally stronger and more aesthetically pleasing. The process also allows for the realisation of individual design ideas, with visible elements made even more spectacular by sophisticated milling and carving in a perfectly uniform finish, with 100% fitting.
For whom is a prefabricated roof recommended?
For those seeking time- and cost-effective solutions: In addition to quick installation, less on-site work reduces labour costs and construction waste.
Environmentally conscious builders: The KészTető means less waste and lower material usage, making it an environmentally friendly choice for those who prioritise sustainability.
Owners of newly built houses: Quick and precise assembly shortens the construction period, allowing you to move in sooner.
For owners of properties awaiting renovation: If the existing roof structure needs to be completely replaced, the quick installation of a prefabricated frame can minimise the disruption to your home.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
