Kirakat
A roof that will look after your family for decades
As the primary line of defence for a house, the roof protects our valuables for decades and guarantees the safety of our family, provided it is built with quality solutions and the right expertise. Here are some considerations to help you avoid disappointment.
Weatherproof products
Increasingly frequent severe storms, hail and extreme temperatures are also a major challenge for the construction industry. The use of materials, the processes used and the manufacturing and installation practices require a new approach.
For Terrán, it is extremely important to fully satisfy customer needs, which is why it aims to meet the highest standards in terms of durability.
With over 100 years of experience in concrete technology, we can say that they are capable of protecting our homes under any circumstances, and what's more, the ClimaControl, ColorSystem, Resistor and Elegant surface treatment processes further increase their lifespan.
They can also greatly reduce the damaging effects of UV radiation, moss and other contaminants, as well as the heating of the shell.
Faster implementation, more durable solutions
The often unpredictable deadlines that professionals face have also driven the industry to develop and use technologies that can significantly optimise production and installation times. At the same time, of course, there has been an increased focus on solutions to increase service life.
The Terrán KészTető has brought a more precise, economical, environmentally conscious and, last but not least, faster alternative to roof structures, enabling millimetre-precise fitting thanks to state-of-the-art CNC robot technology.
Its raw material, spruce, is flexible, tough, has excellent tensile strength values and is easy to work. Its resistance is further enhanced by special wood protection to prevent damage from insects and fungi.
Sustainability backed by time-proven solutions
The extent to which a roof serves the people living under it, and over what period of time, is also determined by its functionality. The use of renewable energy will shape the future of our children and grandchildren, so it is worth thinking about greening at the design stage.
The Generon solar roof system offers an uncompromising solution for creating an aesthetic yet sustainable roof covering. What's more, if you want to install modules in Dark and Red colours at a later date, you can ensure an easier transition to solar power generation in the future by installing the compatible Zenit Max and Rundo from the outset.
Responsibility at all levels
To make durable alternatives widely available, producer responsibility must also be at a high level. The Terrán is committed to doing business in a way that respects our environmental values.
To this end, they meet part of their own operational electricity needs with on-site solar power plants and have switched to geothermal energy at their Bóly plant and across the entire site. In Kunszentmiklós, they also recycle waste heat, use electric forklifts to help move products and focus on paperlessness where feasible.
Build homes that will last for decades with a 50-year or even lifetime guarantee!
Source: Link
-
Road building 2026. 04. 07.
Innovation on the motorway: digital models, drones and future-proof solutions in operations
-
What is being built? 2026. 04. 07.
Budapest’s Citadel has opened – Renovation of the Citadel is complete
-
Industry news 2026. 04. 07.
The biggest problems with paving stones have been resolved
-
What is being built? 2026. 04. 07.
The Galerius in Siófok has reopened as a year-round water park