Zalaegerszeg is to improve the banks of two streams. The Nagypáli stream would have stormwater reservoirs built, while the Ságodi stream would have a 900-metre stretch of its bed modified to allow for controlled, damage-free drainage of water...
The second stage of the two-way widening of Kosztolányi utca, one of the most important main roads in Zalaegerszeg, can begin.
After almost half a century, the most important north-south transport route in Zalaegerszeg is now two-way again, having been renovated at a cost of around HUF 1.8 billion.