Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The government wants 10-year development cycles for the construction sector

    • Young skilled workers can set off on their apprenticeship placements today as well

    • It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about

    • „The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

    • Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!

  • Paks II
  • MKIF
  • What is being built?
    • The care home in Fertőd is to be refurbished

    • The area around Keszthely railway station and the lakeside promenade are also set to be redeveloped – planning contracts have been awarded across a wide range of projects

    • A comprehensive complex of facilities supports the development of children requiring special care in Mórahalom

    • This lorry terminal will relieve pressure on Debrecen’s road network, and this is how the huge car park is being built

    • The west wing of the Janus Pannonius Múzeum is being converted into an archaeological exhibition

  • Climate-X
    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

  • Bound track
    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

  • Magyar Építők

artificial ice rink

  • Current at11 months ago

    A temporary structure was erected for a two-storey ice rink.

    MEVA provided the scaffolding supporting the multi-storey ice rink at the Csepel Ice Park.

  • What is being built?2 years ago

    Santa Claus was seen crossing the new pedestrian bridge of the Balatonfüred Ice Rink for the first time

    It is now possible to skate on the largest ice rink system on the Balaton shore, where the footbridge was built with the PERI UP system.

More Posts
  • Latest
  • Popular
Road building2026. 11. 11.

It’s time for a refurbishment: HEDO is carrying out work on one of Miskolc’s key transport routes

Road building2026. 11. 11.

Four ‘1’s in a row: Esztergom’s transport headache has been resolved

What is being built?2026. 11. 11.

The care home in Fertőd is to be refurbished

Industry news2026. 11. 10.

An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

Industry news2026. 10. 18.

The road construction sector celebrated its half-century anniversary in Eger

Industry news2026. 10. 16.

Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

Railway development2026. 10. 23.

The Buda interchange could also be extended northwards

Current at2026. 10. 17.

Young skilled workers can set off on their apprenticeship placements today as well

Advertisement

Building Connections

Building Connections provides a clear, professional overview of the construction industry in Europe, Central Europe and the Balkans. Exclusive information and accurate content.

Follow us

Latest

  • Road building2026. 11. 11.It’s time for a refurbishment: HEDO is carrying out work on one of Miskolc’s key transport routes
  • Road building2026. 11. 11.Four ‘1’s in a row: Esztergom’s transport headache has been resolved
  • What is being built?2026. 11. 11.The care home in Fertőd is to be refurbished

Selection

  • Industry news2026. 10. 30.We do need a pump after all! – How does the BIM pay for itself in industrial investments?
  • What is being built?2026. 09. 27.One of Gyula’s most important historic monuments is being saved with the meticulous care of a restorer
  • Current at2026. 10. 10.„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

© 2026 Building Connections - BC Zrt. - 13 November 2026.

  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM