Contractors are being sought in Tokaj to build a railway cycle bridge.
A spectacular operation took place in Budapest at the weekend. The old bridge, weighing several hundred tonnes and spanning Bartók Béla út, was lifted from its foundations. The operation was part of the development of the Southern Circular Railway...
The 250-tonne bridge structure was pushed into place in Budapest using special technology without causing major disruption to road and tram traffic.
It took just 14 months to build the 54.4 metre long double-track railway bridge over the Danube-Tisza canal.
On the Sopron-Agfalva railway line, Győr-Sopron-Ebenfurti Vasút Zrt. (GYSEV Zrt.) has launched a public procurement for the partial reconstruction of two 10.70 m reinforced concrete bridges with circular steel reinforcement.