Road building
Aircraft taxiway to be renewed at Liszt Ferenc Airport
Budapest Airport has begun the renovation of the first row of taxiway G serving air traffic around Terminal 1, according to a statement from the company operating the capital's airport. The works are necessary because the existing paved surfaces and utility systems have reached the end of their design life and need to be renovated.
The project, which will be completed in three phases by summer 2026, will include the construction of around 17,000 square metres of new basalt concrete pavement and substructures, storm drains and culverts, as well as the renewal of the visual navigation system, street lighting and lighting system.
During the construction process, Budapest Airport pays special attention to sustainability: nearly 99% of the demolished materials are recycled after obtaining the necessary certifications, thus significantly reducing carbon emissions from transport.
Source : Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage