Road building
Roadworks are taking place at 15 locations in Balatonfüred
As part of Balatonfüred’s road resurfacing programme, work will be smaller-scale road and car park renovation works will be carried out at various locations across the town, to be undertaken by Renesis Ingatlanforgalmazó Kft. in accordance with its tender, valued at approximately 173 million forints.
The development will involve the extension of Csiten Street to Tölgyfa Street, Noszlopy, Vaszary and Berda Streets, the upper sections of Györgyhegyi and Tamási Áron Streets, and the road leading to the Szekér Ernő spring. In addition, the cul-de-sac accessed from Csárda Street and Sellő Street will be upgraded, the road over the railway, the internal road serving the football pitches under the railway, the car parks on Óvoda Street, the first section of the local authority road between Balaton Street and Vadvirág Street, and the section of Temetőköz Street between Palotaalja Street and Cséplő Street will also be renovated.
As part of the project, the contractor will compact the road base over a total area of 7,727 square metres and lay 415.8 cubic metres of AC-11 asphalt wearing course on the sections concerned.
Source: Link
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
-
Bound track 2026. 10. 08.
Déli railway station is set to undergo a major refurbishment, paving the way for double-decker trains
