Road building
A new list from Magyar Közút: these roads in Csongrád-Csanád county will be upgraded by the first half of 2026
It is road renovation season, and accordingly, our newspaper regularly reports on the work being carried out by Magyar Közút Nzrt., mainly smaller roads, typically four- and five-digit roads based on their identification numbers, or about projects planned for the next period, spring 2026. Most recently, a list of current and planned renovations in the county of Komárom-Esztergom in north-eastern Transdanubia, and now from the county of Csongrád-Csanád in the south-east of the country.
As Magyar Közút announced with the local Promenad24, eight sections in the county will be repaired at a cost of nearly 11 billion forints. These projects will be implemented with the support of the EU's TOP Plusz framework, with completion planned for the first half of 2026.
Around four kilometres of the Deer-Szentes link will be upgraded. The Mórahalom crossing will be upgraded on two sections: one for three kilometres and one for one and a half kilometres.
On the road between Tótkomlós and Hódmezővásárhely, 13 kilometres will be resurfaced, between km 12 and 25. On the Balástya-Forráskút section, 6 kilometres of track will be restored, and on the Kiskunhalas-Szeged section, about 2 kilometres. About one and a half kilometres of the Magyartés connecting road will be resurfaced. And last but not least, the Fábiánsebestyén-Eperjes-Gádoros link road will also be upgraded: about 7 km in total.
Source : Link
-
Current at 2026. 09. 09.
A first-hand look at a career in engineering – Duna Group Szabadegyetem is back
-
Climate-X 2026. 09. 09.
Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof
-
Bound track 2026. 09. 15.
Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues
-
Current at 2026. 09. 09.
Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage