Current at

Not only building, but also moving: a fun sports day for KE-VÍZ employees

Published

The employees of the Nyíregyháza company had the opportunity to try their hand at a number of sports at the event. There were only winners in the matches.

The management of KE-VÍZ 21 Zrt. management pays special attention to providing employees with opportunities to engage in sports alongside their work, thereby helping them to stay healthy and balanced. In addition to occasional events, they provide opportunities to work out, do yoga or even use the sauna in one of Nyíregyháza's best-equipped gyms.

Previously, playing tennis together was a great success, as were the sports days, which have now been held again after the enforced break caused by the pandemic. The event was hosted by the company's site in Ibrány, near Nyíregyháza.

The most athletic arrived by bike after a good twenty-five kilometres, and after a breather they even trudged to the nearby Tisza riverbank. But they were not the first to arrive, those who took the opportunity to start the morning with fishing. Then, in smaller and larger groups, other employees of the company arrived, mostly manual workers.

The guests, hungry for sports and a good time together, were served a rich breakfast, and then the action started.

Participants could test their strength in a number of sports

Two teams battled it out on the football pitch, while the beach volleyball court and badminton court also saw some exciting ball games.

Éva Szűcs, one of the emblematic figures of women's football in the county, also took to the pitch among the staff.

"This was a match where it was really about participation, not the result. I felt good and my colleagues were looking after me. I tried other things, I liked petanque, but I didn't feel the technique yet. I also played badminton, but I've given up volleyball. It was my first sports day, but I really liked it. The location was ideal, the food was great, the food was delicious and the atmosphere was excellent", summarised Éva Szűcs, who is the treasurer at the central office.

Petanque moment - Photo from left to right: civil engineering project manager Sándor Márton, chief production engineer of the civil engineering office László Gaál, and Éva Szűcs

Anyone who didn't pick up a bat or ball cheered on their fellow athletes. Ping-pong was popular, with two tables set up in the shade of trees. Petanque was the first demonstration event in the history of the Sports Days, and its simplicity made it great fun for players and fans alike.

Among the most sporty of the lot, Szakolczai Zsolt, the economic director, who regularly goes hiking, cycling or even canoeing, arrived at the Ibrány Sports Day on a bicycle. Golf is closest to his heart, but he also likes ball games.

Zsolt Szakolczai

"Everything was great! As they say: the session achieved its goal. We could fish, play sports or just talk, this time not about the profession in the workplace, but freely about anything, in a really pleasant environment. Of course, I didn't miss football and I played several table tennis matches. I think everyone was satisfied with the food served and as it was possible to wash down the delicious snacks, no one could complain about the atmosphere" - said Zsolt Szakolczai.

Delicious food, music and dancing built community

The organisers also made sure that the calorie intake was adequate, serving a delicious lunch to the tired athletes. There was goulash soup, beef stew with grapefruit, stuffed cabbage and a variety of strudel.

A new feature of the sports competition results was that anyone who tried any of the sports received a raffle ticket, so the most active could collect more. Once the prizes had been collected, the dancing and singing continued and the atmosphere was heightened. The weather was also kind to the participants, as the storm that was sweeping across the country arrived just after the sports day had closed.

János Boros is a warehouseman at Homoktanya and occasional caretaker at the Ibrány site. He has also been involved in the organisation, preparation and follow-up work.

János Boros (centre) with two of his structural engineering colleagues, Pal Poór (left) and András Nagy (right)

"I have been with the company for almost twenty years, and this was not my first sports day. I didn't get to do any sport, as I was on duty, so to speak, but I had a great time. I got positive feedback from everyone and that was the main thing", said the employee.

Source : Link

Popular