Current at
Trondheim's Hungarian-built bridge built in a picturesque setting
Our videographers were also present at the bridge opening ceremony in Trondheim, Norway. According to the footage, the 180-metre-long bicycle and pedestrian bridge built between the districts of Saupstad and Tiller in this town of nearly 250,000 inhabitants offers a magnificent view of the surrounding mountains and forests.
An important fact for the Hungarian construction industry is that the steel structure of the gateway was manufactured in the Duna Group factory in Poland, with the assistance of WKS Duna Polska Sp.z o.o., a member of the group. The bridge, weighing more than 400 tonnes and with 3 openings, is made up of eight huge elements; for extra corrosion protection, the different surfaces are coated with three different paint systems.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
-
Current at 2026. 10. 10.
„The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November
