Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

    • Rental flats, Rákosrendező, decentralisation – important ideas were put forward on the Real Estate Beach Conference stage

    • Sunshine, Lake Balaton, sails – and the key issues facing the domestic property market at the Property Regatta

  • Paks II
  • MKIF
  • What is being built?
    • Development work worth over two billion forints is being prepared at two educational institutions in Kaposvár

    • Everyone needs a bit of exercise! The Fitt park pump track in Barcs was built using hand-formed curves

    • Romania’s largest Lidl shopping centre is being built in Bucharest

    • The Faculty of Health Sciences at the University of Szeged is set for expansion

    • It is not just the paving that is being removed at one of Budapest’s most important cultural and community venues

  • Climate-X
    • Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof

    • A major US investment is boosting energy investment in Romania

    • Kaposvár’s ‘sponge city’ development could serve as a national model programme

    • New car parks with permeable surfacing are being built in Zugló – rainwater will be retained on site

    • It is not an empty building that is energy-efficient, but one that is managed intelligently

  • Bound track
    • Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines

    • Many people have been waiting for this: Zugló railway station is set to undergo a comprehensive refurbishment as part of accessibility improvements

    • Experts are working on a 28-kilometre section of the Miskolc–Hidasnémeti vasútvonalon

    • The SWIETELSKY Vasúttechnika Kft. has been declared the winner in two railway development projects

    • Renovation work begins on one of the country’s most important railway bridges

  • Industry news
    • The AKKO Invest may be expanded to include a designer of airport hotels

    • The KBM call for entries is aimed at the cream of the crop of Hungarian architecture

    • A new co-CEO has joined KÉSZ Csoporth

    • The Sándor Wekerle Housing Construction Programme – up to two billion euros could boost the Hungarian housing construction market

    • The Duna Aszfalt redeems the bonds issued under the GED Africa project

  • Magyar Építők
Metro M32025. 05. 26.

The fully renovated M3 metro has been in use for two years now

Thanks to the renovation of the infrastructure and stations, Budapesters will have almost a new metro line back in the spring of 2023,...

Metro M3

Metro M32024. 02. 20.

Unique solutions, serious efforts behind the steel structures of the new metro stations

Metro M32023. 12. 28.

The new lift for the Határ road underpass is ready, the second will follow in February

  • Metro M32023. 10. 13.

    Metro M3: the entire line has been in the hands of the capital's residents for almost five months

    The SWIETELSKY Vasúttechnika has also used a number of special technologies to upgrade the tracks and install safety systems.

  • Metro M32023. 09. 26.

    What the M3 metro renovation has given - five and a half years of knowledge showcased in one day

    An exceptional amount of expertise and experience has been accumulated during the 5.5-year reconstruction of the M3 metro line. Organised by BKV to mark the end of the project, a full-day forum...

  • Metro M32023. 09. 26.

    KIAG has again worked on the tracks of the BKV rolling stock depot

    The large machine was used for regulatory work on tracks and siding previously renovated in connection with the M3 metro.

  • Metro M32023. 08. 29.

    M3 metro: special elements to reduce the clearance between trains and platforms

    The SWIETELSKY experts will install flexible, yet heavy-duty rubber platform supports along the entire length of the metro line.

  • Metro M32023. 08. 15.

    The bus lanes created during the metro renovation will be revived as cycle lanes

    Cyclists will be able to ride in a protected, safe lane on the north-south route through the centre of Budapest.  

  • Metro M32023. 07. 31.

    M3: The success story of metro replacement Part II - Traffic engineering feats, fine-tuning and implementation

    The most important task in the reconstruction of the M3 metro was to create and maintain bus lanes. This involved significant infrastructure development and specific traffic engineering solutions...

  • Metro M32023. 07. 23.

    M3: The success story of metro replacement Part I - The butterfly effect in surface transport

    The metro replacement during the reconstruction of the M3 metro was the biggest public transport project in recent decades. The replacement buses have covered a total of 23 million kilometres, bypassing the...

More Posts
Next '
  • Latest
  • Popular
Industry news2026. 09. 12.

The AKKO Invest may be expanded to include a designer of airport hotels

Bound track2026. 09. 12.

Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines

Industry news2026. 09. 11.

The KBM call for entries is aimed at the cream of the crop of Hungarian architecture

Current at2026. 09. 11.

Class HE-DO brought the summer to a close with a family sports day

Bound track2026. 09. 11.

Many people have been waiting for this: Zugló railway station is set to undergo a comprehensive refurbishment as part of accessibility improvements

Bound track2026. 08. 17.

New pedestrian crossings and a junction with traffic lights are being built in Angyalföld

Current at2026. 08. 17.

A historic landscape where every stone has a story to tell – the English Garden in Tata is being restored

Industry news2026. 08. 18.

Students were introduced to the high-tech construction industry at BME’s field camp in Göd

What is being built?2026. 08. 18.

New paving, a playground and visitor facilities are being planned for the Várkör area in Pannonhalma

What is being built?2026. 08. 18.

Hungary’s new McDonald’s restaurant has moved into a modernist listed building in the centre of Budapest

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 12 September 2026.