Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The government wants 10-year development cycles for the construction sector

    • Young skilled workers can set off on their apprenticeship placements today as well

    • It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about

    • „The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

    • Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!

  • Paks II
  • MKIF
  • What is being built?
    • The care home in Fertőd is to be refurbished

    • The area around Keszthely railway station and the lakeside promenade are also set to be redeveloped – planning contracts have been awarded across a wide range of projects

    • A comprehensive complex of facilities supports the development of children requiring special care in Mórahalom

    • This lorry terminal will relieve pressure on Debrecen’s road network, and this is how the huge car park is being built

    • The west wing of the Janus Pannonius Múzeum is being converted into an archaeological exhibition

  • Climate-X
    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

  • Bound track
    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

    • This time, speed limits are being lifted on the Hatvan–Szolnok line

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

  • Magyar Építők
Metro M32025. 05. 26.

The fully renovated M3 metro has been in use for two years now

Thanks to the renovation of the infrastructure and stations, Budapesters will have almost a new metro line back in the spring of 2023,...

Metro M3

Metro M32024. 02. 20.

Unique solutions, serious efforts behind the steel structures of the new metro stations

Metro M32023. 12. 28.

The new lift for the Határ road underpass is ready, the second will follow in February

  • Metro M32023. 10. 13.

    Metro M3: the entire line has been in the hands of the capital's residents for almost five months

    The SWIETELSKY Vasúttechnika has also used a number of special technologies to upgrade the tracks and install safety systems.

  • Metro M32023. 09. 26.

    What the M3 metro renovation has given - five and a half years of knowledge showcased in one day

    An exceptional amount of expertise and experience has been accumulated during the 5.5-year reconstruction of the M3 metro line. Organised by BKV to mark the end of the project, a full-day forum...

  • Metro M32023. 09. 26.

    KIAG has again worked on the tracks of the BKV rolling stock depot

    The large machine was used for regulatory work on tracks and siding previously renovated in connection with the M3 metro.

  • Metro M32023. 08. 29.

    M3 metro: special elements to reduce the clearance between trains and platforms

    The SWIETELSKY experts will install flexible, yet heavy-duty rubber platform supports along the entire length of the metro line.

  • Metro M32023. 08. 15.

    The bus lanes created during the metro renovation will be revived as cycle lanes

    Cyclists will be able to ride in a protected, safe lane on the north-south route through the centre of Budapest.  

  • Metro M32023. 07. 31.

    M3: The success story of metro replacement Part II - Traffic engineering feats, fine-tuning and implementation

    The most important task in the reconstruction of the M3 metro was to create and maintain bus lanes. This involved significant infrastructure development and specific traffic engineering solutions...

  • Metro M32023. 07. 23.

    M3: The success story of metro replacement Part I - The butterfly effect in surface transport

    The metro replacement during the reconstruction of the M3 metro was the biggest public transport project in recent decades. The replacement buses have covered a total of 23 million kilometres, bypassing the...

More Posts
Next '
  • Latest
  • Popular
Road building2026. 11. 11.

It’s time for a refurbishment: HEDO is carrying out work on one of Miskolc’s key transport routes

Road building2026. 11. 11.

Four ‘1’s in a row: Esztergom’s transport headache has been resolved

What is being built?2026. 11. 11.

The care home in Fertőd is to be refurbished

Industry news2026. 11. 10.

An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

Bound track2026. 11. 10.

The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

Industry news2026. 10. 18.

The road construction sector celebrated its half-century anniversary in Eger

Industry news2026. 10. 16.

Spectacular arches, ingenious solutions – the designers of the FŐMTERV present Venice’s award-winning bridge

Railway development2026. 10. 23.

The Buda interchange could also be extended northwards

Bound track2026. 10. 19.

This time, speed limits are being lifted on the Hatvan–Szolnok line

Current at2026. 10. 17.

Young skilled workers can set off on their apprenticeship placements today as well

Advertisement

Building Connections

Building Connections provides a clear, professional overview of the construction industry in Europe, Central Europe and the Balkans. Exclusive information and accurate content.

Follow us

Latest

  • Road building2026. 11. 11.It’s time for a refurbishment: HEDO is carrying out work on one of Miskolc’s key transport routes
  • Road building2026. 11. 11.Four ‘1’s in a row: Esztergom’s transport headache has been resolved
  • What is being built?2026. 11. 11.The care home in Fertőd is to be refurbished

Selection

  • What is being built?2026. 10. 16.Renovation work is set to begin on dozens of public buildings in Terézváros
  • What is being built?2026. 08. 25.They haven’t skimped on the technical specifications: this is what the Insula Residential Park in Komárom will look like, featuring the Leier solutions
  • What is being built?2026. 08. 17.Hódmezővásárhely’s renowned Reformed school is to be expanded by one and a half times its current size

© 2026 Building Connections - BC Zrt. - 12 November 2026.

  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM