Industry news

Another area to rely on point cloud surveys

Published

With Industry 4.0 solutions, the PERI improves the accuracy of rack installations.

Knowledge of precise geometric parameters and detailed information is essential for increasing the efficiency of construction processes, especially in the design and implementation phases. Industry 4.0 digital solutions are ideal for this area, particularly point cloud-based modelling. This is based on laser scanning, which can be used to create extremely accurate and detailed 3D models from a single survey. This tool has recently been used by PERI in the installation of its scaffolding systems, with impressive results.

 

 

State-of-the-art for precision

Today, the PERI can easily model even the smallest details with its own laser scanner, making it easy to map even complex structures or industrial environments. The scanner can be used to identify potential problem areas at the design stage and improve operational efficiency based on real geometric data.

Using the scanner can save significant time, especially on larger scale projects, while minimising the potential for measurement error.

Any inaccuracies between plans and reality (including slight deviations from the horizontal or vertical planes) can be easily and quickly eliminated. The ability to adapt to a variety of geometries ensures that the rack always fits exactly in its intended position, allowing the most economical rack layout possible.

A laser scanner is an extremely useful tool at all stages of construction, from site survey, planning and coordination to data reporting for operation. And it makes all this possible at the same time. Point cloud-based surveying is one of the fastest ways to capture the built environment available today: models processed on the Scan-to-BIM platform contribute greatly to efficient communication and automated processes.

In the course of the survey, not only the geometry of the building façade can be determined, but also a feasibility plan, material quantity calculations or even a renovation plan can be easily prepared for the building in question.

This method is particularly useful for maintenance and renovation, where accurate geometry is essential.

 

 

Makes the work of designers much easier

The construction industry is characterised by the need for accurate planning at short notice. A mobile laser scanner can capture millions of points in seconds, ensuring efficient design based on real geometry. 3D laser scanners with LIDAR technology can be used to see the structure down to the millimetre, and the resulting point cloud can be used to easily import the scanned building

into the right software, making it easier to optimise the design and construction process. In addition to the 3D coordinates of the surveyed points, the built-in camera can also be used to capture a real 360° image, allowing you to create a virtual walk-through model.

Combining the advantages of laser scanning and photogrammetry, Reality Capture gives you an accurate digital image of the building's condition.

 

It also simplifies construction and operation

The surveyed points allow designers to rely on actual data during post-production, so if a design change is needed, the original point cloud can easily be used to take the required measurements without the need to repeat the process on site.

This not only makes the planning process more efficient, but also prepares the way for operation with the BIM system.

The scanners are useful not only for buildings, but also for determining the size of depots or structural defects. However, due to the high investment cost of professional measuring instruments and the complexity of processing point clouds, for some projects it may be best to involve a team of experts to develop measurements and plans. At the same time, with the dynamic development of the field, it is expected that processing will become fully automated, which will further speed up the day-to-day workflow.

Source : Link

Popular