Industry news
The House of Hungarian Music was voted one of Europe's most inspiring tourist destinations by readers of a leading British newspaper
Readers of the British publication The Guardian have selected the Hungarian House of Music as one of Europe's most inspiring tourist destinations selected the Hungarian House of Music as one of Europe's most inspiring tourist destinations. In a public vote by the renowned international magazine, which has nearly 200 million readers worldwide, the Hungarian institution, which was realised as part of the Liget Budapest Project, was ranked alongside such landmarks as the Roman amphitheatre in Spain, Hadrian's Wall in England and Kronborg Castle in Denmark, according to a statement by Városliget Zrt..
Also awarded the Construction Industry Quality Award recognised facility we wrote regularly during the investment period, the project was carried out by Magyar Építő Zrt.. Based on the plans of Japanese star architect Shu Fujimoto (with the domestic contribution of M-Teampannon Kft.), the building was completed with the participation of several subcontractors, including Épszerk-Pannónia Invest Kft. (structural engineering) and Weinberg "93 Építő Kft. (steel structures) also contributed. The project was implemented by Óbuda-Újlak Zrt. and Főber Zrt..
"A fascinating place"
"The Hungarian House of Music is an exceptional building located in the beautiful park of Budapest, in the City Park. Entering through the mushroom-shaped main entrance, you find yourself in a museum dedicated to the history of music. From the beginnings of music, through Gregorian chant and Hungarian folk music, to the music of today, everything is here to be discovered. It is a fascinating place."
- writes The Guardian article.
In this article, the long-running British magazine collected readers' opinions on the European locations that have had the biggest impact on them. From Spain to Denmark, from antiquity to modern art, the list includes the most exciting cultural destinations that have inspired readers the most.
"We are extremely proud of the new recognition of the Hungarian House of Music, which confirms the success of our ambition, which was one of our primary goals during the planning phase of the Liget project: to make the City Park a 'must' tourist attraction for visitors to Budapest" - said Benedek Gyorgyevics, CEO of Városliget Zrt., in connection with the recognition of The Guardian.
Ornamental rain falls on the special roof structure
This is not the first time that the Hungarian House of Music has been included in the top list of prestigious international publications, as CNN named it "The World's Most Anticipated Building" before its opening, while in 2022 it was selected as one of the "World's Best Cultural Attractions" by Time Out magazine. It has been included in the patron Architectural Digest Magazine's 2023 Most Influential International Attractions collection, and Time Magazine, one of the world's most well-known magazines, has included it, along with the Ethnographic Museum, in its World’s Greatest Places collection, which guides the travel choices of millions of its readers. The cumulative effect of all this is that in 2023, the Liget Budapest Project won its first tourism-themed award, voted the world's best tourism development in the International Travel Awards competition.
Since its opening in January 2022, the Hungarian House of Music has become one of the most visited cultural institutions in Hungary, with 1.3 million visitors to the institution, which is part of Liget Budapest, making it one of the emblematic venues of the capital's cultural life in an unprecedented short period of time. The feedback from artists and audiences, as well as the attendance figures, clearly show that the Hungarian House of Music has successfully entered the cultural life of the capital not only as a unique architectural work of art, but also through its wide range of programmes.
The house has become one of the most posted buildings in Hungary, with its iconic glass walls and pierced roof in countless photos and videos, and its iconic holes in all social media platforms, both at home and abroad.
Source : Link
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
-
Road building 2026. 10. 13.
A consortium comprising STRABAG and Duna Aszfalt has been awarded the contract to build the North Macedonian motorway
-
Current at 2026. 10. 05.
Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!
-
What is being built? 2026. 10. 09.
One of Budapest’s oldest nurseries is being renovated whilst preserving its timber roof structure
