Industry news

Four design awards for the Market at the Klasszis TopDesign competition

Published

Market Építő Zrt.
Sárvár's 83-room premium hotel, the Melea Hotel, and the 216-room Dorothea Hotel Budapest in the capital were both built by Market Építő Zrt. and both have earned the Klasszis Group's recognition.

The Klasszis Group has again this year announced the Klasszis TopDesign 2024, one of the most comprehensive competitions of the Hungarian hospitality industry, which is aimed at hotels, small and large restaurants, interior and exterior designers, and one of the most prestigious international juries in the hospitality industry.

The new hotel of Sárvár has been awarded

Outstanding design solutions and innovations that enhance the guest experience were also recognised in the 2024 competition, where the Market Építő Zrt. in two categories:

"Klasszis TopDesign Rural 5-star Hotel of the Year 2024"

"Klasszis TopDesign hotel lobby of the year 2024"

A unique and special concept has been developed for the five-star Melea Hotel, which, as we have already wrote, is one of the first hotels in Hungary to offer high-quality health, beauty, dietary and recreational services. The peaceful atmosphere and clean design provide the perfect setting for relaxation and physical and mental rejuvenation, wrote Market in its own Facebook page.

Hotel Dorothea voted best storytelling hotel of 2024

Dorothea Hotel Budapest Autograph Collection was created by Market, a general contractor for the conservation and renovation of valuable parts of listed buildings, and like the one in Sárvár, it won two prizes at the gala. Dorothea was chosen by the jury

"Hotel of the year Klasszis TopDesign "storytelling" 2024" and

"Klasszis TopDesign 5-star Capital City Hotel of the Year 2024"

The project connects buildings from three different eras into a coherent building complex. As our previous our previous articles revealed, while the street-facing façades were restored to their original condition, the inner courtyard was transformed into a 35-metre-wide, glass-covered atrium. The approximately 40 x 40 metre inner courtyard is located on the second floor, where a double ceiling conceals the plant boxes, which accommodate seven-metre-tall trees, and the mechanical systems, most of which are completely sunk into the floor level. The Autograph Collection is a „upscale lifestyle brand” in the Marriott portfolio. Each hotel in this group has its own identity and narrative – each has a story. The concept for Hotel Dorothea branding was developed by Graphasel Stúdió and BDPST Koncept in close collaboration with the experts at Marriott and colleagues at Lissoni & Partners.

Source : Link

Popular