Up to forty percent of a well-chosen and professionally constructed roof is made up of various system components. In addition to aesthetic, high-quality concrete tiles, accessories are also needed for a truly durable roof system. On the terranteto.hu subpage, which is specifically designed for designers, you will find useful information on roof tile selection and roof system accessories. What's more, you can choose from a range of roofing system packages, in which roofing membranes play a key role.
With very few exceptions, the requirements for roofs necessitate the use of underlayment beneath the roof tiles. As roof membranes act as a water drainage layer, their installation can increase watertightness to the required extent, thereby extending the service life of the building materials located under the tiles.
However, in terms of durability, the quality of the roofing membrane you choose does matter. Roof underlayments must meet a number of requirements: first and foremost, they must have W1 waterproofing properties, and adequate strength is also of paramount importance. With their high thermal resistance and humidity resistance, they must be highly adaptable to weather requirements and temperature fluctuations. They must be able to withstand humidity for long periods.
During roof construction or renovation, the roof may not be replaced immediately. In this case, the roof structure is exposed to UV radiation for up to weeks, so the quality of the roofing membrane will determine the extent of the damage. A well-chosen roof membrane not only contributes to a comfortable living environment, but also to the protection of the roof structure. As it is located in the middle of the layer system, its repair or replacement - if not chosen correctly - can only be solved at extra cost.
Terrán MediFol: a solution for every roof
Thanks to the wide selection of MediFol offers a wide range of products, including underlayment that is most suitable for waterproofing both low-slope roofs and built-in attics.
MediFol SD:
-
Recommended for built-in roof terraces.
-
Three-layer underlay.
-
Its vapour permeability eliminates condensation on the underside of the film.
-
It is sufficient to create an air gap between the cover and the underlay.
MediFol 140, MediFol 140 Blue, MediFol Wind Plus, MediFol Wind Plus Black and Wind Plus 150 types:
-
Due to their vapour permeability, there is no fear of condensation on the underside of the film.
-
Recommended primarily for built-up roof spaces.
-
It is sufficient to create an air gap between the cover and the underlay.
-
They can also be used below the specified angle of inclination (α ≥ αk-6°).
MediFol Extreme:
-
It can be installed under low pitch shells (α ≥10°) as waterproof underlay insulation.
MediFol Top 270:
-
Recommended for low pitched roofs.
-
It can be laid directly on decking or on thermal insulation.
-
Three-layer vapour permeability.
MediFol FORTE:
-
For single or double ventilated roofs, built-in attics.
-
It can be laid directly on decking or on thermal insulation.
-
High tensile strength sheet with two self-adhesive adhesive strips.
MediFol Silver:
-
A three-layer waterproof vapour-permeable roofing membrane containing a monolithic polyurethane membrane with two self-adhesive adhesive strips.
-
It can withstand high temperatures (+100°C).
MediFol Generon Longlife and MediFol Generon Longlife Plus:
-
Multilayer vapour permeable, waterproof roofing membranes containing HDPE membrane.
-
They can be laid directly on decking or on thermal insulation.
-
Due to its high thermal resistance, it is also an excellent choice for the manufacturer's Terrán Generon RED and DARK solar roof tiles.
-
With a 25-year guarantee.
The Terrán foil separator makes planning easier
The Terrán Foil Selector application helps designers choose the right roofing foil. By answering a few questions about the roof, the foil selector application shows which product types are worth choosing from. This also helps with more accurate planning and selecting the best roofing foil.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line