Kirakat
Special surface treatment also on corrugated tiles
Renova Plus: the most economical roof tile of the Terrán
There are many important factors to consider when choosing a roof tile, such as environmental friendliness, durability, style and colour, but of course value for money is also a factor.
The Terrán Renova Plus product line guarantees the highest quality at the best price.
The Renova Plus is a classic corrugated roof tile, making it a perfect fit for most buildings. Available in four colours – brick, natural, dark brown and black – this roof tile is ideal for roof renovations and is also available with a special surface treatment.
The ColorSystem process – which is manufactured using environmentally friendly production technology free of solvents and ammonia – provides the high-strength Renova Plus tiles with wear resistance, deeper tones and long-lasting colour protection.
Terrán is the lightest and most popular roof tile
The components of the Synus product family are made of high-strength, coloured concrete and are available with all Terrán surface treatments. The Synus is the most popular product line of the Terrán, accounting for the largest share of the tens of millions of tiles sold annually.
It owes its popularity to its compact structure and light weight, making it a great choice for those who are building or renovating an existing roof, and for whom it is particularly important that the existing roof structure can support the new roof tiles.
Among the Terrán products, the Synus roof tile is available in the widest range of colours, with nine shades, so everyone can find the colour they like best. In addition to the wide range of colours, the lightest product family of Terrán is available with four different surface treatments. Thanks to the Elegant process, the surface of the roof tiles is extremely smooth and resistant. The brick, dark brown and black Synusok tiles have a unique, elegant silk gloss finish. The ColorSystem surface treatment gives the cherry red and hazelnut brown tiles a deeper tone. The Synus Mocca, Coral and Carbon tiles are treated with the premium Resistor surface treatment process, which makes them smooth, refined and more resistant.
The ClimaControl provides long-term protection against infrared radiation, which causes the roof to heat up, for Moon tiles. Thanks to the stable, non-degradable components of the surface treatment, the roof tiles absorb nearly 60% less infrared radiation than %. Terrán also offers a 50-year warranty on Synus and Renova Plus tiles, ensuring that our homes are safe for a lifetime.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
