Kirakat
Innovation on the roof: prefabricated structure rewrites the rules
Based on data previously published by ÉVOSZ, 74% of construction industry players see digital preparedness as the way forward amid shrinking market opportunities. Terrán has always been at the forefront of developing and applying new-generation solutions, increasingly basing its operations on robotics and collaborative technologies in countless areas, while also placing a strong emphasis on greening.
The KészTető was also developed with the aim of making roof construction and renovation faster, more accurate, simpler and more environmentally friendly, all at the highest standard and quality.
The prefabricated structure has many advantages over the traditional method. The secret lies in the computer-aided design and the precision machining of raw materials provided by CNC machines and laser cutting tools. By combining various achievements, such as the integration of CAD/CAM systems, the entire preparation and manufacturing process is automated and optimised, allowing the most complex designs and models to be created and modified. Thanks to this process, each element is cut to the millimetre, of uniform quality, free of defects and with all the pins prepared, significantly increasing the stability of the structures.
As the elements are delivered ready-made to the installation site, all that is required during installation is to assemble and secure them according to plan. As a result, the living environment remains clean, no extra space is required, which can be difficult in certain areas, and the work is quiet and requires few specialists.
The special technology allows the exact amount of material to be determined, less waste is generated, which means that energy losses can be minimised and the environmental impact is therefore much lower in many respects. This is particularly important because over the last 10 years, the EU has seen an upward trend in wood harvesting: for example, according to Eurostat data, 488 million cubic metres of roundwood were harvested in 2020, a decrease of 2% compared to the previous year, but still 21% higher than the figure recorded in 2000.
The importance of prefabricated carpentry structures is increasing. Their reformer role in residential, public and office buildings, as well as in infrastructure upgrades, allows for more efficient design and construction.
With the Terrán and KészTető, even unique ideas can be easily realised, and thanks to the 360° product portfolio, all roofing issues can be addressed in one place.
Redesign your roof construction and learn more about Terrán 1TP3079!
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Current at 2026. 09. 30.
It’s being built at full speed and could be the saviour of our domestic energy security – what is it?
