What is being built?

Weinberg builds a logistics hall with non-standard parameters at the M0

Published

The fourth building of the East Gate Pro Business Park meets the same high sustainability requirements as the previous ones.

Another tenant has chosen East Gate Pro Business Park, which is part of the WING project, according to a statement from the Hungarian property developer. The business park, located at the intersection of the M3 and M0 motorways, is a continuation of East Gate.

The new building is scheduled for completion by the end of this year

Last year, the third hall building in East Gate Pro Park was handed over and now a long-term pre-leasing contract has been signed for the fourth hall, B2, which is being built by Weinberg ’93 Kft.. The 9,000 sq m building is being built under the built-to-suit (BTS) pre-lease and is scheduled for completion by the last quarter of 2024.

As previously indicated, halls A1 and B1, which were handed over in the first phase of East Gate Pro Business Park, were also built in accordance with Weinberg "93 Kft.. These two buildings had previously received BREEAM International New Construction Very Good sustainability certification. which we wrote about in detail in this article.

It adapts to needs with parameters different from standard warehouses

According to a recent announcement, WING Industrial has signed a long-term contract with the Hungarian subsidiary of the parcel logistics group, which is active in Central and Eastern Europe, for the fourth hall of the park. The tenant has nearly three thousand pick-up points in Hungary, and the hall is specifically built for its parcel logistics operations.

In line with the tenant's needs, Hall B2 will be designed to be different from standard warehouses, with, among other things, a larger office area, more space for handling and parking, docking and level doors for cross docking, and a heat pump heating and cooling system. The planned sustainability rating for Hall B2 is BREEAM Very Good, similar to the previously delivered halls.

Zsófia Korda, Senior Sales Manager of WING Zrt., said in the release that an additional 20,000 square metres of hall development is currently under preparation in East Gate Pro Business Park. "In addition, we have previously delivered three halls with a total area of nearly 30,0000 square meters," he recalled.

Source : Link

Popular