What is being built?

The Klösz villa in the Városligeti fasor will be converted into a museum

Published

Photos by György Liget Budapest/Palkó and visuals by Liget Budapest
The National Museum of Photography will open as part of the Liget Project, following the redevelopment of the former villa of the famous photographer György Klösz.

The villa of György Klösz, a prominent figure in Hungarian photography, located on Városligeti fasor, is being converted into a museum. The Klösz villa was previously purchased by Városliget Zrt. with the aim of turning the building into a home for Hungarian photographic art and providing a suitable environment for displaying the country's collection of some 700,000 photographic artefacts. In the negotiated public procurement procedure, companies are expected to submit their bids for the reconstruction work by the beginning of February.

Photo: ligetbudapest.hu / Palkó Gyögry

A huge exhibition space for the masterpieces of photographic history

The National Museum of Photography will open in the villa at 49, Városligeti fasor after the renovation. According to the notice published in the EU's public procurement notice, the reconstruction will include the construction of a 1,423 square metre exhibition space on the 3,545 square metre floor. The foyer will be a generous 100 square metres. The selected company will have to carry out major demolition works, including walls, slabs and suspended ceilings.

Visual design: ligetbudapest.hu

New machinery to provide the necessary conditions for artifacts

The tasks include the installation of new wall and floor tiling. The building's mechanical systems will also be renewed, with the installation of ventilation, heat and smoke extraction systems for the exhibition space. The works will include new insulation on 450 square metres of the flat roof and repairs to the 300 square metres of the high roof.

Photo: ligetbudapest.hu / György Palkó

György Klösz has created a glass-roofed studio in the building

The villa was built by the eminent photographer György Klösz. In 1894, after the Klösz family had bought the property, they had a neoclassical villa built on it, based on the plans of Ármin Schubert and Lajos Hikisch. The first floor of the two-storey building became the scene of family life, while the upper floor with its glass roof and glass façade was occupied by Klösz's studio.
Over time, the family business expanded to include a printing shop, which also operated here. For decades after the Second World War, the Offset and Playing Card Printing Company produced its products here, and in the meantime the building has been significantly extended. After the change of regime, the villa was used as an office building.
After the renovation, the National Museum of Photography is planned to move into the building.

Source : Link

Popular