What is being built?
Pest county municipality develops with road renovation and new drainage
The renovation of Tölgyfa Street is an important part of the local infrastructure development in Monorierdő, located in Pest County. On the section of the aforementioned transport corridor between Nefelejcs and Fenyő Streets, not only will the road surface be renewed, but HE-DO will also improve the efficiency of rainwater drainage in the area and level the public utilities, according to the contractor.
Strengthening the road base
During the works, the specialists will renew the bituminous pavement, reinforce the road base and build a rolled asphalt pavement. An important part of the works will also involve the levelling of existing utility manholes and manhole covers. In addition, a double-sided embankment will be constructed and the existing drainage ditches will be renovated and new earthen ditches will be built to drain rainwater.
The project will be implemented with minimal waste generation
Construction work is expected to be completed in September 2025. A special feature of the project is that the construction material already produced, such as mart asphalt, will be recycled to provide environmentally friendly solutions.
The transport and infrastructure development will be financed by the Operational Programme for Territorial and
Urban Development Plus programme.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Bound track 2026. 10. 07.
Aurora beneath the Apennines – Another tunnel is being built on the Naples–Bari railway line
