Two stormwater retention basins are to be built, and the drainage ditches are to be deepened, reinforced and their network extended.
The stated aim is to make the northern part of the city a more liveable and sustainable place; among other things, the retention of rainwater is also a key focus.
Knee-deep water in the streets, flooded gardens, houses, basements, underpasses, blocked roads. In Hungary, too, flooding and flash floods within municipalities are increasingly challenging the...
HE-DO will carry out road rehabilitation in Monorierdő by recycling asphalt; and new drainage pipes will be built to improve stormwater drainage.
More than 1500 square metres of paving will be renovated in a historic environment.
A stormwater drainage and stormwater reservoir is being built in Tokaj to channel water from the mountain.
Letkés completes blue infrastructure development with EU support.
Zalaegerszeg is to improve the banks of two streams. The Nagypáli stream would have stormwater reservoirs built, while the Ságodi stream would have a 900-metre stretch of its bed modified to allow for controlled, damage-free drainage of water...
Around HUF 273 million is being spent on construction in Pomaz.
The main street of Kisapostag, in the fields, is already being asphalted by STRABAG. A stormwater drainage system and a public park are also being built in the Fejér county village, and the village is being made more accessible and safer...