What is being built?
Workplace nursery and new roof to be built at Bethesda Hospital
In an open public procurement procedure, the Bethesda Children's Hospital of the Reformed Church in Hungary is seeking a contractor for its renovation and expansion, planned for a maximum of 36 months. Applications for the general construction work related to the replacement of the roof of the building at Hungária Körút 200/B, the construction of a new roof level and the creation of a workplace crèche in the basement can be submitted until 3 October.
The early childhood development institute moves to a new home
The ground floor and first floor will be used exclusively for Bethesda Children's Hospital services after minimal reconstruction, but after the roof is demolished, a new monolithic reinforced concrete coffered roof attic will house adult education and Bethesda Children's Hospital outpatient department offices, with the same roof contour as the existing one.
In addition, a workplace crèche will be created on the lower ground floor of the building for the children of the Bethesda Children's Hospital staff. The construction design documentation for the loft conversion of the Bethesda Early Childhood Intervention and Diagnostic Services Pedagogical Specialist Service (KIDSz) building and the construction of a workplace crèche is already available.
The usable area could increase by a third
The hospital needs to increase the internal floor space to cope with its increased responsibilities, so it would like to incorporate attic space into the currently unused loft space, as well as utilize the lower, basement level. The main volumes of the areas concerned are:
- 294,69 m2 waterproofing a building against ground moisture or retrofitting waterproofing;
- 173,52 m2 a social institution, crèche or kindergarten;
- 202 m2 construction of a monolithic vb slab / coffin slab over the attic area;
- 202 m2 for a roof deck with a complex pitched roof structure with a high roof pitch;
- 1238,3 m2 conversion and expansion of the institution during its operation.
Source : Link
-
Kirakat 2026. 10. 01.
A leading machinery distributor in the construction and haulage sectors is building a new service centre and extending its existing premises
-
Railway development 2026. 09. 29.
The railway line leading to the Hungarian border is also set to be upgraded as part of Croatia’s large-scale development programme
-
Current at 2026. 09. 30.
It’s being built at full speed and could be the saviour of our domestic energy security – what is it?
-
Industry news 2026. 10. 02.
Hungary has joined the single electricity market
