Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The government wants 10-year development cycles for the construction sector

    • Young skilled workers can set off on their apprenticeship placements today as well

    • It’s time to provide information to those in the sector – that’s what this year’s Építőipar Summit was all about

    • „The focus will not be on Lean’s equipment, but on how we operate” – the ‘Lean in the Construction Industry’ conference in November

    • Sofitel Hotel is the only Hungarian project in the running for the Dalux Award 2026 award – Watch the video too!

  • Paks II
  • MKIF
  • What is being built?
    • Demolition work is in full swing on the side of the M1 motorway heading towards Győr

    • A college of circus arts is being built in Pesterzsébet

    • Gádoros community centre is being modernised through a complete refurbishment

    • The central section of Szeged’s riverfront is to be transformed into a promenade

    • Hungary’s first indoor sports hall is set to undergo a comprehensive refurbishment

  • Climate-X
    • Desert wind farms, alpine solar power stations – brilliant engineering and construction solutions for harnessing renewable energy

    • A cooling vest, greener tarmac and digital work management: this is how the STRABAG is responding to climate change

    • The area around Malom Lake in Oroszlány has been revitalised with the addition of an owl castle and a viewing hill

    • This is how flash floods on the vineyard-covered hills in the Pécs conurbation are being prevented

    • Szeged is set to regenerate an entire neighbourhood as part of a large-scale green project

  • Bound track
    • A new public procurement process is being prepared to continue the second phase of the Déli körvasút

    • The world’s most beautiful tram line? A fixed-track line has been built on Finland’s longest bridge

    • From the tram tracks to the trees’ root zones: complex design work lays the foundations for the second phase of the Buda Interconnection project

    • Plans are in place for a new depot and track modernisation to accommodate the CAF trams

    • Alpine engineering techniques are also being used to protect the railway in the Danube Bend

  • Industry news
    • An innovative, distinctive PHOENIX Logistics Centre has been established in Győr: the Óbuda Group has reimagined the spaces for pharmaceutical logistics

    • Are you a marketer? Make yourself visible!

    • We do need a pump after all! – How does the BIM pay for itself in industrial investments?

    • The SZABADICS and BME programmes have joined forces: together, they are strengthening the next generation of engineers

    • The road construction sector celebrated its half-century anniversary in Eger

  • Magyar Építők

3. PILLÉR – ÉPKER Kft.

  • What is being built?2 days ago

    Gádoros community centre is being modernised through a complete refurbishment

    The comprehensive refurbishment of the Tót-Asszony Közösségi Ház in Gádoros may be carried out in two phases by 3. PILLÉR – ÉPKER.

More Posts
  • Latest
  • Popular
What is being built?2026. 11. 15.

Demolition work is in full swing on the side of the M1 motorway heading towards Győr

What is being built?2026. 11. 14.

A college of circus arts is being built in Pesterzsébet

Bound track2026. 11. 14.

A new public procurement process is being prepared to continue the second phase of the Déli körvasút

Road building2026. 11. 13.

Major roadworks are set to begin in Pest County – here are the roads affected

Industry news2026. 10. 18.

The road construction sector celebrated its half-century anniversary in Eger

Railway development2026. 10. 23.

The Buda interchange could also be extended northwards

Current at2026. 10. 17.

Young skilled workers can set off on their apprenticeship placements today as well

Bound track2026. 10. 19.

This time, speed limits are being lifted on the Hatvan–Szolnok line

Advertisement

Building Connections

Building Connections provides a clear, professional overview of the construction industry in Europe, Central Europe and the Balkans. Exclusive information and accurate content.

Follow us

Latest

  • What is being built?2026. 11. 15.Demolition work is in full swing on the side of the M1 motorway heading towards Győr
  • What is being built?2026. 11. 14.A college of circus arts is being built in Pesterzsébet
  • Bound track2026. 11. 14.A new public procurement process is being prepared to continue the second phase of the Déli körvasút

Selection

  • What is being built?2026. 10. 06.A new Youth Cultural Centre is being built in the city centre of Nyíregyháza
  • Road building2026. 08. 17.A spectacular phase of construction has begun on the Flórián Square flyover
  • Road building2026. 09. 09.A roundabout with traffic lights could solve the problem at one of Győr’s congested junctions

© 2026 Building Connections - BC Zrt. - 15 November 2026.

  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM