Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • SZABADICS Summer BridgeCamp 2.0 – Where the next generation of engineers is taking shape

    • The capital’s historic drainage system is being renovated

    • The first to arrive for the expansion of the Paks Nuclear Power Plant was a 350-tonne tower crane

    • It showcases not just products, but a complete garden – the Leier show garden in Győr takes landscaping to a whole new level

    • Marketing, Trust and Talent in the Construction Industry – Key Takeaways from the Construction Industry Marketing Communications Conference

  • Paks II
  • MKIF
  • What is being built?
    • Work begins on stabilising the embankment in Balatonkenese

    • The modern poultry processing plant in Szentes is being built at record speed

    • The castle’s role in education in Verpelét may come to an end: the school building is being renovated

    • Research and teaching capacity has quadrupled thanks to the development of Semmelweis University

    • This is how the new Porsche Hungaria logistics hall is rising from the ground in Budaörs

  • Climate-X
    • Practical guides to support the construction industry’s transition to carbon neutrality

    • The renovation of the Balaton water control gate has been recognised with a professional award

    • This is how the construction industry can go green – here’s a leading example from Hungary

    • A solar power plant and energy storage facility in Baracska will boost the supply of renewable energy

    • Research conducted by the University of Szeged has attracted international attention and could provide a new basis for water replenishment planning

  • Bound track
    • A new chapter in the Hungarian bridge-building industry – we explored the most exciting sections of the Southern Circular Railway

    • Work on the embankment is already underway, and trains will soon be running again on the revitalised Transdanubian railway line

    • The modernisation of the Debrecen–Mátészalka railway line has entered the planning phase

    • Szeged railway station and its surroundings could benefit from a comprehensive transport development project

    • Planning can begin – the M2 line could be extended to Cinkota, and the HÉV lines could be upgraded

  • Industry news
    • The young people have spoken: there is no rejection of the construction industry!

    • The Cemix Color Compass online application adds a new dimension to the selection of façade colours

    • A bronze plaque marking the Quality Award for the refurbished stations on the M3 metro line has been unveiled at Kálvin Square

    • An innovative guide to help you choose façade colours: the Cemix Color Compass is here

    • The new division of ÉVOSZ has made fair market competition and feasible plans its guiding principles

  • Magyar Építők

manufacturer of construction products

  • Climate-X2 minutes ago

    Practical guides to support the construction industry’s transition to carbon neutrality

    Magyar Környezettudatos Építés Egyesülete (Hungary Green Building Council, HuGBC) has produced new technical resources for manufacturers of construction products and facility operators. These resources are also intended to provide support...

More Posts
  • Latest
  • Popular
What is being built?2026. 05. 15.

Work begins on stabilising the embankment in Balatonkenese

Climate-X2026. 05. 15.

Practical guides to support the construction industry’s transition to carbon neutrality

Road building2026. 05. 15.

The motorway in Bihor, which was left unfinished 13 years ago, is to be built as part of an exemplary Romanian-Hungarian cooperation

Road building2026. 05. 14.

The new bridge on the M7 motorway is now open; demolition of the old bridge can begin

Industry news2026. 04. 15.

How can we build good schools? The answer will be revealed at the KÉK roundtable

Bound track2026. 04. 15.

Szeged railway station and its surroundings could benefit from a comprehensive transport development project

What is being built?2026. 04. 15.

Munich Airport’s new passenger terminal has been handed over – it is set to handle 6 million more passengers a year

Climate-X2026. 04. 15.

Hungarian premiere: air ducts made from recycled steel at Univer’s factory in Kecskemét

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections - BC Zrt.