Building Connections
  • Language
  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Insects
  • Current at
  • Energy
  • Engineer of the month
  • Industry news
  • Property
  • Kirakat
  • Climate-X
  • Bound track
  • What is being built?
  • Road building
  • Railway development
  • Water management
Building Connections

Building Connections

  • English (UK)
    • Magyar
    • Deutsch
    • Polski
    • Română
  • Current at
    • The contractors for the Szolnok spa have brought a lawsuit against the city to secure payment of their final invoice

    • An exemplary model from Borsod – the synergy between father and son is driving Mento Csoportot forward

    • Class HE-DO brought the summer to a close with a family sports day

    • Summer BridgeCamp: SZABADICS shows young engineers what the construction industry is really like

    • A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

  • Paks II
  • MKIF
  • What is being built?
    • Four blocks, 254 flats: structural work on the Csepel apartment block is progressing using PERI systems

    • A mental fitness course, a fire station, an eight-metre-high green wall – this is what the new NKE building looks like

    • A project on a scale not seen for decades is set to begin on Verseny Street

    • A hospital is being built in the heart of Budapest – it will be ready to admit patients in just under a year’s time

    • Another block of flats could be extended by two storeys in the Ferencváros regeneration area

  • Climate-X
    • Regionális Szárazgazdálkodási Együttműködés was founded in Debrecen

    • The first municipal thermal power station in Transylvania is under construction

    • From the heating plant to the library – solar panels are to be installed on eight local authority buildings in Kiskunfélegyháza

    • The construction of huge water reservoirs would help to strengthen Debrecen’s drinking water supply

    • Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof

  • Bound track
    • Major renovation work is set to begin on the Buda section of tram line 6

    • Work has begun: the spur line will provide a direct rail link between Szombathely and Zalaegerszeg

    • Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues

    • Drilling is also taking place beneath the railway: work on the Déli Körvasút project continues with the relocation of utility lines

    • Many people have been waiting for this: Zugló railway station is set to undergo a comprehensive refurbishment as part of accessibility improvements

  • Industry news
    • „It has reaffirmed that this is my path” – The 7th Duna Group Szabadegyetem has come to an end

    • The designers of flagship projects took home one of the most prestigious professional awards for the Mérnöki Kamara

    • A joint professional development day for the team: they can gain hands-on experience of the latest developments in the construction industry on the ÉMW course

    • A huge brush was driven through the Sopron tunnel on the M85 – with video

    • The construction industry is both vast and marvellous – the Duna Group Szabadegyetem has been launched

  • Magyar Építők

Hochtief AG

  • Water management3 days ago

    A 27-kilometre project deep inside an Alpine mountain – we visited the Semmering Tunnel

    The Magyar Építők visited one of Europe’s largest ongoing railway projects: the construction project, with a budget of 4.38 billion euros, is now in its final stages. The 27.3-kilometre tunnel consists of two...

More Posts
  • Latest
  • Popular
Industry news2026. 10. 04.

„It has reaffirmed that this is my path” – The 7th Duna Group Szabadegyetem has come to an end

Water management2026. 10. 03.

Condominium grant schemes, a national knowledge centre, and reconstruction in Ukraine – forward-looking initiatives discussed at the ÉVOSZ board meeting

What is being built?2026. 10. 03.

Four blocks, 254 flats: structural work on the Csepel apartment block is progressing using PERI systems

Water management2026. 10. 03.

The technology used on the Déli Körvasút is being praised in the international press

What is being built?2026. 09. 09.

Romania’s largest Lidl shopping centre is being built in Bucharest

Climate-X2026. 09. 09.

Nyíregyháza Spartacus FC goes green – four hundred solar panels to be installed on the stadium roof

Current at2026. 09. 09.

A first-hand look at a career in engineering – Duna Group Szabadegyetem is back

Bound track2026. 09. 15.

Nearly 50,000 people travel on it every day – the refurbishment of the Cegléd main line continues

Advertisement
Building Connections
  • Building Connections
  • Data protection
  • Copyrights
  • Impressum
  • Cookie settings
  • Tokajland
  • BC COMM

© 2026 Building Connections – BC Zrt. – 4 October 2026.