A €10 billion investment is planned, with a focus on modernising the railway and renewing the rolling stock - the future of the sector was discussed at the HUNGRAIL conference.
As part of the V0 bypass.
According to the plans, a double-track, electrified line with a speed of 100-120 km/h will be built on the designated Szolnok-Kecskemét-Székesfehérvár-Győr line, partly on a new track.