Road building

Connecting road renewed in Békés county

Published

Photos by István Kónya/Facebook
A more than 2 km section of the road connecting Dobozt and Békéscsaba was upgraded at a cost of HUF 221 million.

A 2.2-kilometre section of the road between Doboz and Békéscsaba has been renovated as part of the Hungarian Village Programme: work was carried out on connecting road 4239 during the investment – writes gyulaihirlap.hu. The project was worth 221 million forints.

The press conference on the successful project, held on 23 June at the Dobozi Road bridge of the Kettős-Körös River, was attended by József Kovács, Member of Parliament; István Kónya, Chairman of the Békés County Regional Development Committee and András Cserkúti, Director of Magyar Közút Nonprofit Zrt. Békés County.

István Kónya reminded us in a Facebook post reminded: this is one of the busiest side roads in the area, used by many people every day. He emphasised that the road surface had previously fallen into a state of significant disrepair, which the development has remedied. He added that Magyar Közút was responsible for the construction.

András Cserkúti stated in a report on gyulatelevizio.hu based on the following: the affected section of road was given a double layer of asphalt surfacing, and a one-metre-wide verge was built on both sides to ensure safe traffic flow.

Source : Link

Popular