Road building
One of the streets in Erzsébetváros, Pest, is becoming greener and more bicycle-friendly
According to a press release from the Erzsébetváros local government , development work on Dembinszky Street has been ongoing since December last year.
The primary aim of the investment is to reduce motor vehicle traffic by prioritising pedestrian and bicycle transport, while creating as much green space as possible.
The street near Városliget will receive a gross development of 793 million, for which the 7th district municipality has won a non-repayable grant in the TOP_PLUSZ „Healthy Streets” competition.
Details of the investment were also published on the local government's website. Among other things, the pavements, car parks and road surfaces will be renovated, and
- pedestrian crossings and cycle lanes will be created;
- barrier-free pavement surfaces are created;
- In addition to planting 36 trees, 453 square metres of green space will be created, complete with an irrigation system.;
- benches, chairs and waste bins will be installed;
- In addition, the light fixtures are being replaced with LED lamps.
Source: Link
-
What is being built? 2026. 07. 27.
Construction of Phase VIII of the Somfa Liget residential estate is underway using hybrid construction methods, prefabricated elements and the LEAN organisation model
-
Water management 2026. 07. 27.
Szeged is getting rid of its asbestos-cement and cast-iron pipes
-
What is being built? 2026. 08. 06.
Paks II.: What does the new milestone for Unit 5 mean in the context of the review?
-
Road building 2026. 08. 05.
The main road leading to a key tourist destination in Bihar is being upgraded using cold recycling technology